X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415063008000

Well Details

Well ID: 0415063008000
Loading map...
Location: 00/08-30-041-06W5/0
Location Alias: 00/08-30-41-06 W5M
Location Alias 2: 00/08-30-041-06 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 06
Section: 30
County/Municipality: Clearwater County
Well Name: INPLAY OIL HZ WILLGR 8-30-41-6
Operator Name: InPlay Oil Corp.
License Number: 0486702
License Date: 2017-12-01
License Status: Issued
Spud Date: 2018-07-07
Final Drill Date: 2018-07-17
Well Total Depth: 5155.00 m
Surface Hole Latitude: 52.558978
Surface Hole Longitude: -114.891832

For data sources see[1][2]

Well History

Date Event
2017-12-01 Obtained License
2018-07-08 Surface Casing Operation Performed
2018-07-10 Direction Drilling Operation Performed - Deviate
2018-07-11 Direction Drilling Operation Performed - Horizontal
2018-07-17 Finished Drilling
2018-07-17 Well Log Performed
2018-07-17 Well Mode changed to Drilled and Cased
2018-07-18 Production Casing Operation Performed
2018-07-19 Rig Released
2018-07-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-29 Well Began Production
2018-07-29 Well Fluid changed to Crude Oil
2018-07-29 Well Mode changed to Flowing
2018-08-01 Well Fluid changed to Crude Oil
2018-08-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-07-07 Ironhand Drilling Inc. 9 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-07-10 1612.60 Deviate (5 - 79 degrees)
2018-07-11 2110.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-07-25 Multi-Stage Fracture 5124.90 5125.50 0
2018-07-26 Multi-Stage Fracture 4864.30 4866.20 0
2018-07-26 Multi-Stage Fracture 4832.60 4834.50 0
2018-07-26 Multi-Stage Fracture 4802.40 4804.30 0
2018-07-26 Multi-Stage Fracture 4774.30 4776.20 0
2018-07-26 Multi-Stage Fracture 4743.20 4745.10 0
2018-07-26 Multi-Stage Fracture 4713.00 4714.90 0
2018-07-26 Multi-Stage Fracture 4681.40 4683.30 0
2018-07-26 Multi-Stage Fracture 4651.90 4653.80 0
2018-07-26 Multi-Stage Fracture 4621.40 4623.30 0
2018-07-26 Multi-Stage Fracture 4590.30 4592.20 0
2018-07-26 Multi-Stage Fracture 5108.20 5110.10 0
2018-07-26 Multi-Stage Fracture 4559.20 4561.20 0
2018-07-26 Multi-Stage Fracture 4527.60 4529.50 0
2018-07-26 Multi-Stage Fracture 4496.30 4498.20 0
2018-07-26 Multi-Stage Fracture 4465.20 4467.10 0
2018-07-26 Multi-Stage Fracture 4434.30 4436.20 0
2018-07-26 Multi-Stage Fracture 4404.20 4406.10 0
2018-07-26 Multi-Stage Fracture 4373.90 4375.90 0
2018-07-26 Multi-Stage Fracture 4342.80 4344.80 0
2018-07-26 Multi-Stage Fracture 4312.70 4314.70 0
2018-07-26 Multi-Stage Fracture 4280.70 4282.60 0
2018-07-26 Multi-Stage Fracture 5077.70 5079.60 0
2018-07-26 Multi-Stage Fracture 4250.30 4252.30 0
2018-07-27 Multi-Stage Fracture 4226.40 4228.40 0
2018-07-27 Multi-Stage Fracture 4195.30 4197.20 0
2018-07-27 Multi-Stage Fracture 4165.10 4167.00 0
2018-07-27 Multi-Stage Fracture 4133.50 4135.40 0
2018-07-27 Multi-Stage Fracture 4102.50 4104.40 0
2018-07-27 Multi-Stage Fracture 4072.20 4074.10 0
2018-07-27 Multi-Stage Fracture 4041.40 4043.30 0
2018-07-27 Multi-Stage Fracture 4009.50 4011.50 0
2018-07-27 Multi-Stage Fracture 3981.40 3983.30 0
2018-07-26 Multi-Stage Fracture 5046.70 5048.60 0
2018-07-27 Multi-Stage Fracture 3949.90 3951.80 0
2018-07-27 Multi-Stage Fracture 3919.20 3921.10 0
2018-07-27 Multi-Stage Fracture 3888.20 3890.10 0
2018-07-27 Multi-Stage Fracture 3857.30 3859.20 0
2018-07-27 Multi-Stage Fracture 3826.70 3828.60 0
2018-07-27 Multi-Stage Fracture 3795.60 3797.50 0
2018-07-27 Multi-Stage Fracture 3764.60 3766.60 0
2018-07-27 Multi-Stage Fracture 3734.20 3736.10 0
2018-07-27 Multi-Stage Fracture 3705.00 3706.90 0
2018-07-27 Multi-Stage Fracture 3673.20 3675.20 0
2018-07-26 Multi-Stage Fracture 5015.40 5017.30 0
2018-07-27 Multi-Stage Fracture 3642.30 3644.20 0
2018-07-27 Multi-Stage Fracture 3612.50 3614.40 0
2018-07-27 Multi-Stage Fracture 3581.60 3583.60 0
2018-07-27 Multi-Stage Fracture 3549.90 3551.80 0
2018-07-27 Multi-Stage Fracture 3519.20 3521.10 0
2018-07-27 Multi-Stage Fracture 3488.90 3490.80 0
2018-07-27 Multi-Stage Fracture 3457.80 3459.70 0
2018-07-27 Multi-Stage Fracture 3427.00 3428.90 0
2018-07-27 Multi-Stage Fracture 3395.80 3397.80 0
2018-07-27 Multi-Stage Fracture 3364.60 3366.50 0
2018-07-26 Multi-Stage Fracture 4985.50 4987.40 0
2018-07-27 Multi-Stage Fracture 3332.80 3334.70 0
2018-07-27 Multi-Stage Fracture 3302.80 3304.70 0
2018-07-27 Multi-Stage Fracture 3271.90 3273.80 0
2018-07-27 Multi-Stage Fracture 3241.90 3243.80 0
2018-07-27 Multi-Stage Fracture 3211.90 3213.80 0
2018-07-27 Multi-Stage Fracture 3181.40 3183.30 0
2018-07-27 Multi-Stage Fracture 3149.70 3151.60 0
2018-07-27 Multi-Stage Fracture 3118.30 3120.30 0
2018-07-27 Multi-Stage Fracture 3088.00 3090.00 0
2018-07-27 Multi-Stage Fracture 3058.40 3060.30 0
2018-07-26 Multi-Stage Fracture 4954.70 4956.60 0
2018-07-27 Multi-Stage Fracture 3027.50 3029.40 0
2018-07-27 Multi-Stage Fracture 2997.00 2998.90 0
2018-07-27 Multi-Stage Fracture 2967.70 2969.60 0
2018-07-27 Multi-Stage Fracture 2936.90 2938.90 0
2018-07-27 Multi-Stage Fracture 2905.30 2907.20 0
2018-07-27 Multi-Stage Fracture 2873.90 2875.80 0
2018-07-27 Multi-Stage Fracture 2842.50 2844.40 0
2018-07-28 Multi-Stage Fracture 2811.80 2813.70 0
2018-07-28 Multi-Stage Fracture 2781.50 2783.50 0
2018-07-28 Multi-Stage Fracture 2751.50 2753.40 0
2018-07-26 Multi-Stage Fracture 4926.80 4928.70 0
2018-07-28 Multi-Stage Fracture 2720.50 2722.40 0
2018-07-28 Multi-Stage Fracture 2692.60 2694.50 0
2018-07-28 Multi-Stage Fracture 2662.50 2664.40 0
2018-07-28 Multi-Stage Fracture 2631.80 2633.70 0
2018-07-28 Multi-Stage Fracture 2601.30 2603.20 0
2018-07-28 Multi-Stage Fracture 2571.40 2573.40 0
2018-07-28 Multi-Stage Fracture 2541.00 2542.90 0
2018-07-28 Multi-Stage Fracture 2511.80 2513.70 0
2018-07-28 Multi-Stage Fracture 2388.40 2390.30 0
2018-07-28 Multi-Stage Fracture 2356.90 2358.80 0
2018-07-26 Multi-Stage Fracture 4896.20 4898.10 0
2018-07-28 Multi-Stage Fracture 2325.50 2327.50 0
2018-07-28 Multi-Stage Fracture 2294.50 2296.50 0
2018-07-28 Multi-Stage Fracture 2263.60 2265.50 0
2018-07-28 Multi-Stage Fracture 2232.00 2233.90 0
2018-07-28 Multi-Stage Fracture 2200.40 2202.30 0
2018-07-28 Multi-Stage Fracture 2169.60 2171.50 0
2018-07-28 Multi-Stage Fracture 2140.50 2142.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-07-25 2018-07-28 1,997 9,020 N/A
2 2018-07-26 2018-07-28 1,997 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid 7647-01-0 100 0.5253 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.5234 N/A
Water 7732-18-5 100 94.2623 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 3.8356 N/A
2K7 Solution Element Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol (BNPD) 52-51-7 100 0.0203 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0203 N/A
ELECC-1 Element Clay Control 2-Hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0982 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0982 N/A
ELEFR-3A Element Friction Reducer Non-hazardous Ingredients Not Available 100 0.0564 N/A
Tergitol 15-S-20 68131-40-8 100 0.0564 N/A
ELESurf-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.0961 N/A
Methanol 67-56-1 100 0.0961 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0961 N/A
2 20/40 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 1.9219 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-07-23 2018-07-28 Surface Water - Runoff 6092
2018-07-26 2018-07-28 Surface Water - Runoff 4454

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2992 0.0 0.0 0.0
2019 8438 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-07-19 No Incident Encountered 0.00 0.00
2018-08-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References