X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415062516002

Well Details

Well ID: 0415062516002
Loading map...
Location: 00/16-25-041-06W5/2
Location Alias: 00/16-25-41-06 W5M
Location Alias 2: 00/16-25-041-06 W5/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 06
Section: 25
County/Municipality: Clearwater County
Well Name: MUTINY WILLGR 16-25-41-6
Operator Name: Bonavista Energy Corporation
License Number: 0091282
License Date: 1981-07-16
License Status: Issued
Spud Date: 1981-08-01
Final Drill Date: 1981-08-28
Well Total Depth: 2519.00 m
Surface Hole Latitude: 52.563215
Surface Hole Longitude: -114.727194

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-07-16 Obtained License
1981-08-22 Drill Stem Test Performed
1981-08-28 Finished Drilling
1981-08-31 Drill Stem Test Performed
1981-09-01 Drill Stem Test Performed
1981-09-04 Production Casing Operation Performed
1981-11-03 Perforation Treatment Performed - Jet Perforation
1981-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-12-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-12-11 Perforation Treatment Performed - Jet Perforation
1981-12-14 Perforation Treatment Performed - Fractured
1982-04-05 Well Mode changed to Drilled and Cased
1982-04-07 Perforation Treatment Performed - Jet Perforation
1982-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-09-13 Perforation Treatment Performed - Fractured
1984-05-01 Well Began Production
1984-05-01 Well Fluid changed to Gas
1984-05-01 Well Mode changed to Flowing
2011-10-25 Well Fluid changed to Gas
2011-10-25 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-11-03 Perforation 2443.00 2444.50 13
1982-09-13 Fracture 1884.90 1888.40 0
1981-11-20 Acid Treatment 2443.00 2444.50 0
1981-12-03 Packing Device Capped w/Cement 2408.00 2418.00 0
1981-12-11 Perforation 2331.00 2334.00 6
1981-12-14 Fracture 2331.00 2334.00 0
1982-04-07 Perforation 1884.90 1886.60 12
1982-04-07 Perforation 1886.90 1887.60 12
1982-04-07 Perforation 1887.90 1888.40 12
1982-04-08 Acid Treatment 1884.90 1888.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 142 0.0 0.0 0.0
1982 785 0.0 0.0 0.0
1984 6005 0.0 0.0 0.0
1985 7422 0.0 0.0 0.0
1986 7033 0.0 0.0 0.0
1987 7370 0.0 0.0 0.0
1988 2034 0.0 0.0 0.0
1989 3705 0.0 0.0 0.0
1990 6440 0.0 0.0 0.0
1991 7943 0.0 0.0 0.0
1992 5327 0.0 0.0 0.0
1993 8429 0.0 0.0 0.0
1994 8201 0.0 0.0 0.0
1995 6835 0.0 0.0 0.0
1996 408 0.0 0.0 0.0
1997 6883 0.0 0.0 0.0
1998 5577 0.0 0.0 0.0
1999 7461 0.0 0.0 0.0
2000 7301 0.0 0.0 0.0
2001 4244 0.0 0.0 0.0
2002 8090 0.0 0.0 0.0
2003 7461 0.0 0.0 0.0
2004 7781 0.0 0.0 0.0
2005 8613 0.0 0.0 0.0
2006 8395 0.0 0.0 0.0
2007 8640 0.0 0.0 0.0
2008 7894 0.0 0.0 0.0
2009 8298 0.0 0.0 0.0
2010 8497 0.0 0.0 0.0
2011 7292 0.0 0.0 0.0
2012 7035 0.0 0.0 0.0
2013 6592 0.0 0.0 0.0
2014 8757 0.0 0.0 0.0
2015 8687 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References