X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415062414030

Well Details

Well ID: 0415062414030
Loading map...
Location: 03/14-24-041-06W5/0
Location Alias: 03/14-24-41-06 W5M
Location Alias 2: 03/14-24-041-06 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 06
Section: 24
County/Municipality: Clearwater County
Well Name: BEC 103 HZ WILLGR 14-24-41-6
Operator Name: Bonavista Energy Corporation
License Number: 0458134
License Date: 2013-07-18
License Status: Issued
Spud Date: 2013-08-28
Final Drill Date: 2013-09-20
Well Total Depth: 4700.00 m
Surface Hole Latitude: 52.532266
Surface Hole Longitude: -114.725077

For data sources see[1][2]

Well History

Date Event
2013-07-18 Obtained License
2013-08-29 Lost Circulation Occurred
2013-09-01 Surface Casing Operation Performed
2013-09-02 Well Log Performed
2013-09-05 Direction Drilling Operation Performed - Deviate
2013-09-06 Direction Drilling Operation Performed - Horizontal
2013-09-10 Intermediate Casing Operation Performed
2013-09-20 Finished Drilling
2013-09-20 Well Log Performed
2013-09-20 Well Mode changed to Drilled and Cased
2013-09-23 Liner Casing Operation Performed
2013-09-23 Perforation Treatment Performed - Open-Hole Completion
2013-09-24 Rig Released
2013-10-16 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-17 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-18 Perforation Treatment Performed - Multi-Stage Fracture
2013-12-11 Perforation Treatment Performed - Casing Patch (Over Perfs)
2014-02-27 Perforation Treatment Performed - Multi-Stage Fracture
2014-03-06 Perforation Treatment Performed - Jet Perforation
2014-03-08 Well Fluid changed to Gas
2014-03-08 Well Mode changed to Testing
2014-03-18 Well Fluid changed to Gas
2014-03-18 Well Mode changed to Test Completed
2014-05-08 Well Began Production
2014-05-08 Well Fluid changed to Gas
2014-05-08 Well Mode changed to Flowing
2015-08-27 Well Fluid changed to Gas
2015-08-27 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-08-28 Savanna Drilling Corp. 604 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-09-05 2080.00 Deviate (5 - 79 degrees)
2013-09-06 2458.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-09-23 Open Hole/Barefoot Completion 4680.00 4700.00 0
2013-10-17 Multi-Stage Fracture 3748.40 3748.50 0
2013-10-17 Multi-Stage Fracture 3629.00 3629.10 0
2013-10-17 Multi-Stage Fracture 3512.00 3512.10 0
2013-10-17 Multi-Stage Fracture 3395.80 3395.90 0
2013-10-17 Multi-Stage Fracture 3290.70 3290.80 0
2013-10-18 Multi-Stage Fracture 3172.00 3172.10 0
2013-10-18 Multi-Stage Fracture 3052.90 3053.00 0
2013-10-18 Multi-Stage Fracture 2933.50 2933.60 0
2013-10-18 Multi-Stage Fracture 2828.40 2828.50 0
2013-12-11 Casing Patch 2933.50 2933.60 0
2013-10-16 Multi-Stage Fracture 4655.80 4655.90 0
2013-12-11 Casing Patch 2828.40 2828.50 0
2014-02-27 Multi-Stage Fracture 3290.70 3290.80 0
2014-02-27 Multi-Stage Fracture 3395.80 3395.90 0
2014-02-27 Multi-Stage Fracture 3512.00 3512.10 0
2014-02-27 Multi-Stage Fracture 3629.00 3629.10 0
2014-02-27 Multi-Stage Fracture 3748.40 3748.50 0
2014-02-27 Multi-Stage Fracture 3867.80 3867.90 0
2014-02-27 Multi-Stage Fracture 3986.50 3986.60 0
2014-02-27 Multi-Stage Fracture 4090.80 4090.90 0
2014-02-27 Multi-Stage Fracture 4210.40 4210.50 0
2013-10-16 Multi-Stage Fracture 4562.40 4562.50 0
2014-03-06 Perforation 2818.00 2819.70 20
2014-03-06 Perforation 2923.00 2924.70 20
2014-03-06 Perforation 3012.00 3013.70 20
2013-10-16 Multi-Stage Fracture 4447.60 4447.70 0
2013-10-16 Multi-Stage Fracture 4329.20 4329.30 0
2013-10-17 Multi-Stage Fracture 4210.40 4210.50 0
2013-10-17 Multi-Stage Fracture 4090.80 4090.90 0
2013-10-17 Multi-Stage Fracture 3986.50 3986.60 0
2013-10-17 Multi-Stage Fracture 3867.80 3867.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-10-16 2014-02-27 2,369 0 N/A
2 2014-02-27 2014-02-27 2,369 0 N/A
3 2013-10-16 2013-10-18 2,369 0 N/A
4 2013-10-18 2013-10-18 2,369 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* Not Available 100 41.0004 N/A
2 ClearFRAC XT:Water; N002 Schlumberger Crystalline silica 14808-60-7 100 31.5728 N/A
ClearFRAC XT:Water; N002 Schlumberger Energizing Fluid Acetic acid ethenyl ester; polymer with ethenol 25213-24-5 100 0.0019 N/A
Benzenesulfonic acid; 4-ethenyl-; sodium salt; homopolymer 25704-18-1 100 0.0206 N/A
Cholinium chloride 67-48-1 100 0.0656 N/A
Erucic amidopropyl dimethyl betaine 149879-98-1 100 0.2673 N/A
Isopropanol 67-63-0 100 0.1857 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0.0002 N/A
Nitrogen; liquid form 7727-37-9 100 27.9774 N/A
Polyvinyl acetate; partially hydrolyzed 304443-60-5 100 0.0005 N/A
Sodium chloride 7647-14-5 100 0.0367 N/A
Sodium chloroacetate 3926-62-3 100 0.0034 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0086 N/A
3 ClearFRAC XT; N002 Schlumberger Crystalline silica 14808-60-7 100 28.4413 N/A
ClearFRAC XT; N002 Schlumberger Energizing Fluid Acetic acid ethenyl ester; polymer with ethenol 25213-24-5 100 0.0016 N/A
Benzenesulfonic acid; 4-ethenyl-; sodium salt; homopolymer 25704-18-1 100 0.0172 N/A
Cholinium chloride 67-48-1 100 0.0756 N/A
Erucic amidopropyl dimethyl betaine 149879-98-1 100 0.2472 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0.0002 N/A
Nitrogen; liquid form 7727-37-9 100 29.3979 N/A
Polyvinyl acetate; partially hydrolyzed 304443-60-5 100 0.0004 N/A
Propan-2-ol 67-63-0 100 0.1679 N/A
Sodium chloride 7647-14-5 100 0.0339 N/A
Sodium chloroacetate 3926-62-3 100 0.0032 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0072 N/A
4 ClearFRAC XT; N002 Schlumberger Energizing Fluid Alcohol; C11-14; ethoxylated 78330-21-9 100 0.0009 N/A
Alcohol; C7-9-iso; C8; ethoxylated 78330-19-5 100 0.0019 N/A
Alcohol; C9-11-iso; C10; ethoxylated 78330-20-8 100 0.0019 N/A
Ethoxylated propoxylated 4-nonylphenol-formaldehyde resin 30846-35-6 100 0.0014 N/A
Heavy aromatic naphtha 64742-94-5 100 0.0009 N/A
Methanol 67-56-1 100 0.011 N/A
Naphtalene (impurity) 91-20-3 100 0.0001 N/A
Poly(oxy-1;2-ethanediyl) 25322-68-3 100 0.0004 N/A
Quaternary ammonium compounds chlorides derivatives 68989-00-4 100 0.0009 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-10-11 2013-10-31 Municipal Water 67
2013-10-11 2013-12-17 Surface Water - Runoff 1926
2013-12-08 2013-12-14 Central Water Distribution Facility 117
2014-02-27 2014-02-27 Surface Water - Runoff 1081

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 5715 0.0 0.0 0.0
2015 8264 0.0 0.0 0.0
2016 8651 0.0 0.0 0.0
2017 7878 0.0 0.0 0.0
2018 8547 0.0 0.0 0.0
2019 8279 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-08-29 Lost Circulation 123.00 132.00
2014-04-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References