If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0415062211020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.568678,"lon":-114.786459,"icon":""}]} |
Location: 02/11-22-041-06W5/0 | |
Location Alias: 02/11-22-41-06 W5M | |
Location Alias 2: 02/11-22-041-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 5 | |
Range: 06 | |
Section: 22 | |
County/Municipality: Clearwater County | |
Well Name: INPLAY OIL 102 HZ WILLGR 11-22-41-6 | |
Operator Name: InPlay Oil Corp. | |
License Number: 0490489 | |
License Date: 2018-08-16 | |
License Status: Amended | |
Spud Date: 2018-09-04 | |
Final Drill Date: 2018-09-12 | |
Well Total Depth: 4295.00 m | |
Surface Hole Latitude: 52.568678 | |
Surface Hole Longitude: -114.786459 |
Date | Event |
---|---|
2018-08-16 | Obtained License |
2018-09-06 | Surface Casing Operation Performed |
2018-09-08 | Direction Drilling Operation Performed - Deviate |
2018-09-08 | Direction Drilling Operation Performed - Horizontal |
2018-09-12 | Finished Drilling |
2018-09-12 | Well Log Performed |
2018-09-12 | Well Mode changed to Drilled and Cased |
2018-09-15 | Production Casing Operation Performed |
2018-09-15 | Rig Released |
2018-09-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-09-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-09-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-09-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-10-04 | Well Began Production |
2018-10-04 | Well Fluid changed to Crude Oil |
2018-10-04 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-09-04 | Ironhand Drilling Inc. | 8 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-09-08 | 1557.10 | Deviate (5 - 79 degrees) |
2018-09-08 | 2083.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-09-26 | Multi-Stage Fracture | 4266.50 | 4267.00 | 0 |
2018-09-27 | Multi-Stage Fracture | 4048.60 | 4049.30 | 0 |
2018-09-27 | Multi-Stage Fracture | 4022.20 | 4022.90 | 0 |
2018-09-27 | Multi-Stage Fracture | 3996.00 | 3996.60 | 0 |
2018-09-27 | Multi-Stage Fracture | 3971.40 | 3972.00 | 0 |
2018-09-27 | Multi-Stage Fracture | 3945.70 | 3946.30 | 0 |
2018-09-27 | Multi-Stage Fracture | 3919.30 | 3919.90 | 0 |
2018-09-27 | Multi-Stage Fracture | 3892.40 | 3893.00 | 0 |
2018-09-27 | Multi-Stage Fracture | 3840.00 | 3840.60 | 0 |
2018-09-27 | Multi-Stage Fracture | 3813.40 | 3814.00 | 0 |
2018-09-27 | Multi-Stage Fracture | 3786.70 | 3787.30 | 0 |
2018-09-27 | Multi-Stage Fracture | 4238.60 | 4239.30 | 0 |
2018-09-27 | Multi-Stage Fracture | 3759.80 | 3760.50 | 0 |
2018-09-27 | Multi-Stage Fracture | 3732.90 | 3733.50 | 0 |
2018-09-27 | Multi-Stage Fracture | 3707.10 | 3707.80 | 0 |
2018-09-27 | Multi-Stage Fracture | 3679.30 | 3679.90 | 0 |
2018-09-27 | Multi-Stage Fracture | 3653.60 | 3654.20 | 0 |
2018-09-27 | Multi-Stage Fracture | 3628.00 | 3628.70 | 0 |
2018-09-27 | Multi-Stage Fracture | 3601.10 | 3601.70 | 0 |
2018-09-27 | Multi-Stage Fracture | 3574.50 | 3575.20 | 0 |
2018-09-27 | Multi-Stage Fracture | 3548.10 | 3548.80 | 0 |
2018-09-27 | Multi-Stage Fracture | 3521.60 | 3522.20 | 0 |
2018-09-27 | Multi-Stage Fracture | 4218.00 | 4218.70 | 0 |
2018-09-27 | Multi-Stage Fracture | 3494.80 | 3495.40 | 0 |
2018-09-27 | Multi-Stage Fracture | 3468.30 | 3469.00 | 0 |
2018-09-27 | Multi-Stage Fracture | 3440.80 | 3441.50 | 0 |
2018-09-27 | Multi-Stage Fracture | 3413.80 | 3414.50 | 0 |
2018-09-28 | Multi-Stage Fracture | 3387.70 | 3388.30 | 0 |
2018-09-28 | Multi-Stage Fracture | 3360.70 | 3361.40 | 0 |
2018-09-28 | Multi-Stage Fracture | 3334.20 | 3334.80 | 0 |
2018-09-28 | Multi-Stage Fracture | 3308.10 | 3308.80 | 0 |
2018-09-28 | Multi-Stage Fracture | 3281.70 | 3282.40 | 0 |
2018-09-28 | Multi-Stage Fracture | 3256.50 | 3257.10 | 0 |
2018-09-27 | Multi-Stage Fracture | 4193.80 | 4194.40 | 0 |
2018-09-28 | Multi-Stage Fracture | 3230.00 | 3230.70 | 0 |
2018-09-28 | Multi-Stage Fracture | 3203.20 | 3203.80 | 0 |
2018-09-28 | Multi-Stage Fracture | 3179.90 | 3180.50 | 0 |
2018-09-28 | Multi-Stage Fracture | 3156.70 | 3157.40 | 0 |
2018-09-28 | Multi-Stage Fracture | 3130.30 | 3130.90 | 0 |
2018-09-28 | Multi-Stage Fracture | 3103.90 | 3104.60 | 0 |
2018-09-28 | Multi-Stage Fracture | 3077.80 | 3078.40 | 0 |
2018-09-28 | Multi-Stage Fracture | 3025.40 | 3026.00 | 0 |
2018-09-28 | Multi-Stage Fracture | 2999.60 | 3000.20 | 0 |
2018-09-28 | Multi-Stage Fracture | 2973.00 | 2973.70 | 0 |
2018-09-27 | Multi-Stage Fracture | 4168.80 | 4169.50 | 0 |
2018-09-28 | Multi-Stage Fracture | 2947.40 | 2948.10 | 0 |
2018-09-28 | Multi-Stage Fracture | 2921.20 | 2921.90 | 0 |
2018-09-28 | Multi-Stage Fracture | 2896.30 | 2897.00 | 0 |
2018-09-28 | Multi-Stage Fracture | 2870.60 | 2871.30 | 0 |
2018-09-28 | Multi-Stage Fracture | 2844.40 | 2845.10 | 0 |
2018-09-28 | Multi-Stage Fracture | 2818.80 | 2819.50 | 0 |
2018-09-28 | Multi-Stage Fracture | 2792.70 | 2793.30 | 0 |
2018-09-28 | Multi-Stage Fracture | 2766.10 | 2766.70 | 0 |
2018-09-28 | Multi-Stage Fracture | 2739.60 | 2740.20 | 0 |
2018-09-28 | Multi-Stage Fracture | 2712.90 | 2713.50 | 0 |
2018-09-27 | Multi-Stage Fracture | 4143.90 | 4144.60 | 0 |
2018-09-29 | Multi-Stage Fracture | 2685.80 | 2686.40 | 0 |
2018-09-29 | Multi-Stage Fracture | 2659.70 | 2660.40 | 0 |
2018-09-29 | Multi-Stage Fracture | 2633.10 | 2633.80 | 0 |
2018-09-29 | Multi-Stage Fracture | 2606.50 | 2607.20 | 0 |
2018-09-29 | Multi-Stage Fracture | 2580.20 | 2580.90 | 0 |
2018-09-29 | Multi-Stage Fracture | 2553.50 | 2554.10 | 0 |
2018-09-29 | Multi-Stage Fracture | 2527.50 | 2528.20 | 0 |
2018-09-29 | Multi-Stage Fracture | 2501.20 | 2501.90 | 0 |
2018-09-29 | Multi-Stage Fracture | 2475.20 | 2475.90 | 0 |
2018-09-29 | Multi-Stage Fracture | 2448.40 | 2449.00 | 0 |
2018-09-27 | Multi-Stage Fracture | 4125.30 | 4125.90 | 0 |
2018-09-29 | Multi-Stage Fracture | 2428.30 | 2428.90 | 0 |
2018-09-29 | Multi-Stage Fracture | 2407.50 | 2408.10 | 0 |
2018-09-29 | Multi-Stage Fracture | 2383.50 | 2384.20 | 0 |
2018-09-29 | Multi-Stage Fracture | 2360.30 | 2361.00 | 0 |
2018-09-29 | Multi-Stage Fracture | 2340.10 | 2340.70 | 0 |
2018-09-29 | Multi-Stage Fracture | 2313.60 | 2314.30 | 0 |
2018-09-29 | Multi-Stage Fracture | 2288.10 | 2288.80 | 0 |
2018-09-29 | Multi-Stage Fracture | 2262.50 | 2263.10 | 0 |
2018-09-29 | Multi-Stage Fracture | 2236.10 | 2236.80 | 0 |
2018-09-29 | Multi-Stage Fracture | 2209.60 | 2210.30 | 0 |
2018-09-27 | Multi-Stage Fracture | 4101.50 | 4102.10 | 0 |
2018-09-29 | Multi-Stage Fracture | 2183.40 | 2184.10 | 0 |
2018-09-27 | Multi-Stage Fracture | 4074.50 | 4075.20 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-09-26 | 2018-09-29 | 1,948 | 7,683 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Hydrochloric Acid | 7647-01-0 | 100 | 0.6683 | N/A | |||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.6641 | N/A | ||||
Water | 7732-18-5 | 100 | 94.5891 | N/A | ||||
20/40 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 1.8822 | N/A | ||
30/50 Mesh | Element | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 3.6461 | N/A | ||
2K7 Solution | Element | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol (BNPD) | 52-51-7 | 100 | 0.0211 | N/A | |
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0211 | N/A | ||||
ELECC-1 | Element | Clay Control | 2-Hydroxy-N.N.N-trimethylethanaminium chloride | 67-48-1 | 100 | 0.1046 | N/A | |
Non hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.1046 | N/A | ||||
ELEFR-3A | Element | Friction Reducer | Non-hazardous Ingredients | Not Available | 100 | 0.0597 | N/A | |
Tergitol 15-S-20 | 68131-40-8 | 100 | 0.0597 | N/A | ||||
ELESurf-3 | Element | Surfactant | Isopropyl alcohol | 67-63-0 | 100 | 0.0935 | N/A | |
Methanol | 67-56-1 | 100 | 0.0935 | N/A | ||||
Non-hazardous ingredients (WHMIS criteria) | Not Available | 100 | 0.0935 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-09-20 | 2018-09-29 | Surface Water - Runoff | 9692 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 2052 | 0.0 | 0.0 | 0.0 |
2019 | 8550 | 0.0 | 0.0 | 0.0 |
2020 | 2103 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-09-15 | No Incident Encountered | 0.00 | 0.00 |
2018-10-02 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]