X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415061113000

Well Details

Well ID: 0415061113000
Loading map...
Location: 00/13-11-041-06W5/0
Location Alias: 00/13-11-41-06 W5M
Location Alias 2: 00/13-11-041-06 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 06
Section: 11
County/Municipality: Clearwater County
Well Name: ENTRADA WILLGR 13-11-41-6
Operator Name: Entrada Resources Inc.
License Number: 0437478
License Date: 2011-10-05
License Status: Issued
Spud Date: 2011-11-26
Final Drill Date: 2011-12-06
Well Total Depth: 3452.00 m
Surface Hole Latitude: 52.508018
Surface Hole Longitude: -114.761313

For data sources see[1][2]

Well History

Date Event
2011-10-05 Obtained License
2011-11-26 Lost Circulation Occurred
2011-11-28 Surface Casing Operation Performed
2011-11-29 Well Log Performed
2011-12-01 Direction Drilling Operation Performed - Horizontal
2011-12-03 Well Log Performed
2011-12-06 Finished Drilling
2011-12-06 Well Mode changed to Drilled and Cased
2011-12-08 Liner Casing Operation Performed
2011-12-08 Perforation Treatment Performed - Open-Hole Completion
2011-12-08 Production Casing Operation Performed
2011-12-08 Rig Released
2012-01-17 Well Fluid changed to Crude Oil
2012-01-17 Well Mode changed to Drilling and Completing
2012-01-21 Well Log Performed
2012-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-05-01 Well Began Production
2012-05-01 Well Fluid changed to Crude Oil
2012-05-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-01 1499.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-08 Open Hole/Barefoot Completion 3429.00 3452.00 0
2012-01-24 Multi-Stage Fracture 2631.40 2631.90 0
2012-01-24 Multi-Stage Fracture 2540.20 2540.70 0
2012-01-24 Multi-Stage Fracture 2434.30 2434.80 0
2012-01-24 Multi-Stage Fracture 2342.50 2343.00 0
2012-01-24 Multi-Stage Fracture 2251.40 2251.90 0
2012-01-24 Multi-Stage Fracture 2145.50 2146.00 0
2012-01-23 Multi-Stage Fracture 3419.70 3420.20 0
2012-01-23 Multi-Stage Fracture 3326.40 3326.90 0
2012-01-23 Multi-Stage Fracture 3235.10 3235.60 0
2012-01-23 Multi-Stage Fracture 3115.00 3115.50 0
2012-01-23 Multi-Stage Fracture 3024.40 3024.90 0
2012-01-23 Multi-Stage Fracture 2932.70 2933.20 0
2012-01-23 Multi-Stage Fracture 2828.00 2828.50 0
2012-01-23 Multi-Stage Fracture 2765.50 2766.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4816 0.0 0.0 0.0
2013 8334 0.0 0.0 0.0
2014 8483 0.0 0.0 0.0
2015 8640 0.0 0.0 0.0
2016 8400 0.0 0.0 0.0
2017 8698 0.0 0.0 0.0
2018 8655 0.0 0.0 0.0
2019 8748 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-11-26 Lost Circulation 56.00 57.00

For data sources see[7]

References