X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415060916030

Well Details

Well ID: 0415060916030
Loading map...
Location: 03/16-09-041-06W5/0
Location Alias: 03/16-09-41-06 W5M
Location Alias 2: 03/16-09-041-06 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 06
Section: 09
County/Municipality: Clearwater County
Well Name: BEC HZ WILLGR 16-9-41-6
Operator Name: Bonavista Energy Corporation
License Number: 0448060
License Date: 2012-08-29
License Status: Issued
Spud Date: 2012-11-03
Final Drill Date: 2012-11-16
Well Total Depth: 3955.00 m
Surface Hole Latitude: 52.506505
Surface Hole Longitude: -114.798607

For data sources see[1][2]

Well History

Date Event
2012-08-29 Obtained License
2012-11-03 Surface Casing Operation Performed
2012-11-04 Direction Drilling Operation Performed - Deviate
2012-11-08 Direction Drilling Operation Performed - Horizontal
2012-11-08 Well Log Performed
2012-11-09 Intermediate Casing Operation Performed
2012-11-16 Finished Drilling
2012-11-16 Well Log Performed
2012-11-16 Well Mode changed to Drilled and Cased
2012-11-18 Liner Casing Operation Performed
2012-11-19 Perforation Treatment Performed - Open-Hole Completion
2012-11-19 Rig Released
2012-11-21 Well Log Performed
2012-11-30 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-05 Well Began Production
2012-12-05 Well Fluid changed to Gas
2012-12-05 Well Mode changed to Flowing
2015-07-13 Well Fluid changed to Gas
2015-07-13 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-11-03 Savanna Drilling Corp. 638 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-11-04 1044.40 Deviate (5 - 79 degrees)
2012-11-08 2550.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-11-19 Open Hole/Barefoot Completion 3953.00 3955.00 0
2012-11-30 Multi-Stage Fracture 3014.00 3014.10 0
2012-11-30 Multi-Stage Fracture 2896.00 2896.10 0
2012-11-30 Multi-Stage Fracture 2778.00 2778.10 0
2012-11-30 Multi-Stage Fracture 3930.50 3930.60 0
2012-11-30 Multi-Stage Fracture 3830.90 3831.00 0
2012-11-30 Multi-Stage Fracture 3713.70 3713.80 0
2012-11-30 Multi-Stage Fracture 3596.00 3596.10 0
2012-11-30 Multi-Stage Fracture 3479.40 3479.50 0
2012-11-30 Multi-Stage Fracture 3371.00 3371.10 0
2012-11-30 Multi-Stage Fracture 3248.00 3248.10 0
2012-11-30 Multi-Stage Fracture 3131.00 3131.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 279 0.0 0.0 0.0
2013 7958 0.0 0.0 0.0
2014 8405 0.0 0.0 0.0
2015 8095 0.0 0.0 0.0
2016 8756 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8376 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-16 No Incident Encountered 0.00 0.00
2012-12-06 No Incident Encountered 0.00 0.00

For data sources see[8]

References