X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415060101000

Well Details

Well ID: 0415060101000
Loading map...
Location: 00/01-01-041-06W5/0
Location Alias: 00/01-01-41-06 W5M
Location Alias 2: 00/01-01-041-06 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 06
Section: 01
County/Municipality: Clearwater County
Well Name: ENTRADA WILLGR 1-1-41-6
Operator Name: Entrada Resources Inc.
License Number: 0442877
License Date: 2012-01-14
License Status: Issued
Spud Date: 2012-02-29
Final Drill Date: 2012-03-09
Well Total Depth: 3443.00 m
Surface Hole Latitude: 52.511406
Surface Hole Longitude: -114.724692

For data sources see[1][2]

Well History

Date Event
2012-01-14 Obtained License
2012-02-29 Lost Circulation Occurred
2012-03-01 Surface Casing Operation Performed
2012-03-05 Direction Drilling Operation Performed - Horizontal
2012-03-09 Finished Drilling
2012-03-09 Well Log Performed
2012-03-09 Well Mode changed to Drilled and Cased
2012-03-10 Intermediate Casing Operation Performed
2012-03-10 Liner Casing Operation Performed
2012-03-10 Perforation Treatment Performed - Open-Hole Completion
2012-03-11 Rig Released
2012-06-03 Perforation Treatment Performed - Multi-Stage Fracture
2012-06-04 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-17 Well Began Production
2012-10-17 Well Fluid changed to Crude Oil
2012-10-17 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-03-05 1955.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-10 Open Hole/Barefoot Completion 3424.00 3443.00 0
2012-06-04 Multi-Stage Fracture 2711.40 2711.90 0
2012-06-04 Multi-Stage Fracture 2637.40 2637.90 0
2012-06-04 Multi-Stage Fracture 2455.60 2456.10 0
2012-06-04 Multi-Stage Fracture 2441.60 2442.10 0
2012-06-04 Multi-Stage Fracture 2370.10 2370.60 0
2012-06-04 Multi-Stage Fracture 2284.40 2284.90 0
2012-06-04 Multi-Stage Fracture 2200.40 2200.90 0
2012-06-03 Multi-Stage Fracture 3414.70 3415.20 0
2012-06-03 Multi-Stage Fracture 3338.10 3338.60 0
2012-06-03 Multi-Stage Fracture 3252.30 3252.80 0
2012-06-03 Multi-Stage Fracture 3178.20 3178.70 0
2012-06-03 Multi-Stage Fracture 3092.20 3092.70 0
2012-06-03 Multi-Stage Fracture 3029.50 3030.00 0
2012-06-03 Multi-Stage Fracture 2989.90 2990.40 0
2012-06-04 Multi-Stage Fracture 2908.00 2908.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 1434 0.0 0.0 0.0
2013 8578 0.0 0.0 0.0
2014 8464 0.0 0.0 0.0
2015 7694 0.0 0.0 0.0
2016 8274 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8737 0.0 0.0 0.0
2019 8711 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-02-29 Lost Circulation 92.00 92.00
2012-07-05 No Incident Encountered 0.00 0.00

For data sources see[7]

References