X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415053516002

Well Details

Well ID: 0415053516002
Loading map...
Location: 00/16-35-041-05W5/2
Location Alias: 00/16-35-41-05 W5M
Location Alias 2: 00/16-35-041-05 W5/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 05
Section: 35
County/Municipality: Clearwater County
Well Name: HARVEST GILBY 16-35-41-5
Operator Name: Harvest Operations Corp.
License Number: 0079062
License Date: 1979-11-05
License Status: Suspension
Spud Date: 1979-11-15
Final Drill Date: 1979-12-09
Well Total Depth: 2323.00 m
Surface Hole Latitude: 52.578164
Surface Hole Longitude: -114.606892

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-11-05 Obtained License
1979-11-24 Drill Stem Test Performed
1979-12-02 Drill Stem Test Performed
1979-12-09 Finished Drilling
1979-12-09 Well Log Performed
1979-12-10 Drill Stem Test Performed
1979-12-12 Production Casing Operation Performed
1980-02-22 Perforation Treatment Performed - Jet Perforation
1980-02-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-06-24 Perforation Treatment Performed - Jet Perforation
1981-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-08-09 Perforation Treatment Performed - Jet Perforation
1985-08-09 Well Log Performed
1985-08-13 Perforation Treatment Performed - Fractured
1985-08-20 Well Log Performed
1985-11-01 Well Mode changed to Drilled and Cased
2002-12-03 Well Began Production
2002-12-03 Well Fluid changed to Gas
2002-12-03 Well Mode changed to Flowing
2008-01-01 Well Fluid changed to Gas
2008-01-01 Well Mode changed to Pumping
2008-12-12 Well Log Performed
2012-05-01 Well Fluid changed to Gas
2012-05-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-02-22 Perforation 2270.00 2272.00 7
1985-08-13 Fracture 1303.50 1315.00 0
1980-02-22 Perforation 2274.00 2275.50 7
1980-02-23 Acid Treatment 2270.00 2275.50 0
1981-06-24 Perforation 2252.50 2254.00 7
1981-06-24 Perforation 2254.50 2256.00 7
1981-06-26 Acid Treatment 2252.50 2256.00 0
1985-08-09 Perforation 1313.50 1315.00 7
1985-08-09 Perforation 1306.00 1307.50 7
1985-08-09 Perforation 1303.50 1305.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 667 0.0 0.0 0.0
2003 6932 0.0 0.0 0.0
2004 6929 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8733 0.0 0.0 0.0
2007 8260 0.0 0.0 0.0
2008 8455 0.0 0.0 0.0
2009 8507 0.0 0.0 0.0
2010 8721 0.0 0.0 0.0
2011 6863 0.0 0.0 0.0

For data sources see[5]

References