X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415052014000

Well Details

Well ID: 0415052014000
Loading map...
Location: 00/14-20-041-05W5/0
Location Alias: 00/14-20-41-05 W5M
Location Alias 2: 00/14-20-041-05 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 05
Section: 20
County/Municipality: Clearwater County
Well Name: BEC WILLGR 14-20-41-5
Operator Name: Bonavista Energy Corporation
License Number: 0436531
License Date: 2011-09-02
License Status: Amended
Spud Date: 2011-10-04
Final Drill Date: 2011-10-20
Well Total Depth: 3965.00 m
Surface Hole Latitude: 52.536997
Surface Hole Longitude: -114.682138

For data sources see[1][2]

Well History

Date Event
2011-09-02 Obtained License
2011-10-05 Surface Casing Operation Performed
2011-10-08 Direction Drilling Operation Performed - Horizontal
2011-10-11 Well Log Performed
2011-10-14 Intermediate Casing Operation Performed
2011-10-14 Well Log Performed
2011-10-20 Finished Drilling
2011-10-20 Well Log Performed
2011-10-20 Well Mode changed to Drilled and Cased
2011-10-21 Liner Casing Operation Performed
2011-10-21 Perforation Treatment Performed - Open-Hole Completion
2011-10-23 Rig Released
2012-01-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-09 Well Fluid changed to Gas
2012-01-09 Well Mode changed to Testing
2012-01-10 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-18 Well Fluid changed to Gas
2012-01-18 Well Mode changed to Test Completed
2012-06-19 Well Began Production
2012-06-19 Well Fluid changed to Gas
2012-06-19 Well Mode changed to Flowing
2013-06-28 Well Fluid changed to Gas
2013-06-28 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-08 1865.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-21 Open Hole/Barefoot Completion 3900.00 3965.00 0
2012-01-09 Multi-Stage Fracture 3079.70 3080.20 0
2012-01-09 Multi-Stage Fracture 2974.90 2975.40 0
2012-01-10 Multi-Stage Fracture 2854.50 2855.00 0
2012-01-10 Multi-Stage Fracture 2746.70 2747.20 0
2012-01-09 Multi-Stage Fracture 3884.10 3888.30 0
2012-01-09 Multi-Stage Fracture 3790.80 3791.30 0
2012-01-09 Multi-Stage Fracture 3683.10 3683.60 0
2012-01-09 Multi-Stage Fracture 3554.30 3554.80 0
2012-01-09 Multi-Stage Fracture 3432.80 3433.30 0
2012-01-09 Multi-Stage Fracture 3354.40 3354.90 0
2012-01-09 Multi-Stage Fracture 3276.00 3276.50 0
2012-01-09 Multi-Stage Fracture 3211.40 3211.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 4686 0.0 0.0 0.0
2013 8419 0.0 0.0 0.0
2014 8115 0.0 0.0 0.0
2015 8078 0.0 0.0 0.0
2016 8575 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8327 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References