If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0415040806002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.512873,"lon":-114.545056,"icon":""}]} |
| Location: 00/06-08-041-04W5/2 | |
| Location Alias: 00/06-08-41-04 W5M | |
| Location Alias 2: 00/06-08-041-04 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 041 | |
| Meridian: 5 | |
| Range: 04 | |
| Section: 08 | |
| County/Municipality: Clearwater County | |
| Well Name: BEC GILBY 6-8-41-4 | |
| Operator Name: Bonavista Energy Corporation | |
| License Number: 0181981 | |
| License Date: 1995-11-09 | |
| License Status: Abandoned | |
| Spud Date: 1996-02-22 | |
| Final Drill Date: 1996-03-10 | |
| Well Total Depth: 2306.00 m | |
| Surface Hole Latitude: 52.512873 | |
| Surface Hole Longitude: -114.545056 |
| Date | Event |
|---|---|
| 1995-11-09 | Obtained License |
| 1996-02-23 | Lost Circulation Occurred |
| 1996-02-24 | Surface Casing Operation Performed |
| 1996-03-10 | Finished Drilling |
| 1996-03-10 | Well Log Performed |
| 1996-03-10 | Well Mode changed to Drilled and Cased |
| 1996-03-11 | Drill Stem Test Performed |
| 1996-03-13 | Production Casing Operation Performed |
| 1996-03-13 | Rig Released |
| 1996-03-28 | Well Log Performed |
| 1996-03-29 | Perforation Treatment Performed - Jet Perforation |
| 1996-03-29 | Well Log Performed |
| 1996-09-19 | Perforation Treatment Performed - Jet Perforation |
| 1996-09-19 | Well Log Performed |
| 1996-09-19 | Well Mode changed to Drilled and Cased |
| 1996-09-20 | Perforation Treatment Performed - Fractured |
| 2012-01-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-01-24 | Plug Back Performed |
| 2012-01-24 | Well Mode changed to Abandoned Zone |
| 2012-01-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-01-25 | Plug Back Performed |
| 2012-01-30 | Perforation Treatment Performed - Jet Perforation |
| 2012-01-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-01-31 | Perforation Treatment Performed - Remedial Casing |
| 2012-02-01 | Perforation Treatment Performed - Jet Perforation |
| 2012-02-02 | Perforation Treatment Performed - Remedial Casing |
| 2012-02-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2012-02-03 | Perforation Treatment Performed - Jet Perforation |
| 2012-02-20 | Well Abandoned |
| 2012-02-20 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1996-03-29 | Perforation | 2165.00 | 2169.00 | 13 |
| 2012-02-02 | Remedial Casing Cementing | 597.00 | 598.00 | 0 |
| 2012-02-03 | Packing Device Capped w/Cement | 382.00 | 390.00 | 0 |
| 2012-02-03 | Packing Device Capped w/Cement | 587.00 | 595.00 | 0 |
| 2012-02-03 | Perforation | 398.00 | 399.00 | 17 |
| 2012-02-03 | Perforation | 583.00 | 584.00 | 17 |
| 2012-02-03 | Packing Device Capped w/Cement | 567.00 | 575.00 | 0 |
| 1996-09-19 | Perforation | 1720.50 | 1722.00 | 13 |
| 1996-09-20 | Fracture | 1720.50 | 1722.00 | 0 |
| 2012-01-24 | Packing Device Capped w/Cement | 2147.00 | 2155.00 | 0 |
| 2012-01-25 | Packing Device Capped w/Cement | 1706.00 | 1714.00 | 0 |
| 2012-01-30 | Perforation | 1076.50 | 1077.50 | 17 |
| 2012-01-31 | Remedial Casing Cementing | 1076.50 | 1077.50 | 0 |
| 2012-01-31 | Packing Device Capped w/Cement | 1066.00 | 1074.00 | 0 |
| 2012-02-01 | Perforation | 597.00 | 598.00 | 17 |
For data sources see[4]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1996-02-23 | Lost Circulation | 142.00 | 298.00 |
For data sources see[5]