X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415031010003

Well Details

Well ID: 0415031010003
Loading map...
Location: 00/10-10-041-03W5/3
Location Alias: 00/10-10-41-03 W5M
Location Alias 2: 00/10-10-041-03 W5/03
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 03
Section: 10
County/Municipality: Lacombe County
Well Name: MNK GILBY 10-10-41-3
Operator Name: Manitok Energy Inc.
License Number: 0020081
License Date: 1960-12-01
License Status: Suspension
Spud Date: 1960-12-16
Final Drill Date: 1961-01-19
Well Total Depth: 2197.60 m
Surface Hole Latitude: 52.517797
Surface Hole Longitude: -114.346825

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-12-01 Obtained License
1961-01-19 Finished Drilling
1961-01-19 Well Mode changed to Drilled and Cased
1961-01-20 Drill Stem Test Performed
1961-01-21 Production Casing Operation Performed
1961-02-01 Perforation Treatment Performed - Jet Perforation
1961-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-02-02 Perforation Treatment Performed - Acid Wash - No Pressure
1986-08-13 Well Log Performed
1994-07-23 Perforation Treatment Performed - Jet Perforation
1994-07-24 Perforation Treatment Performed - Jet Perforation
1994-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-04 Plug Back Performed
1994-10-05 Perforation Treatment Performed - Jet Perforation
2001-02-07 Well Log Performed
2001-05-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-05-30 Perforation Treatment Performed - Jet Perforation
2001-05-30 Well Log Performed
2001-05-31 Perforation Treatment Performed - Fractured
2001-06-04 Well Began Production
2001-06-04 Well Fluid changed to Gas
2001-06-04 Well Mode changed to Flowing
2019-04-01 Well Fluid changed to Gas
2019-04-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-02-01 Perforation 2139.40 2159.20 13
1994-10-05 Perforation 2122.00 2128.00 13
1994-10-05 Perforation 2128.40 2134.20 13
2001-05-29 Packing Device Capped w/Cement 2112.00 2120.00 0
2001-05-30 Perforation 2105.00 2108.00 17
2001-05-31 Fracture 2105.00 2108.00 0
1961-02-01 Perforation 2161.00 2164.10 13
1961-02-02 Acid Wash 2139.40 2164.10 0
1961-02-02 Acid Treatment 2139.40 2164.10 0
1994-07-23 Perforation 2144.00 2149.00 20
1994-07-23 Perforation 2151.00 2161.00 20
1994-07-23 Perforation 2163.00 2168.00 20
1994-07-24 Perforation 2139.00 2144.00 20
1994-10-04 Packing Device Capped w/Cement 2135.00 2137.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 4669 0.0 0.0 0.0
2002 8069 0.0 0.0 0.0
2003 8355 0.0 0.0 0.0
2004 8308 0.0 0.0 0.0
2005 8310 0.0 0.0 0.0
2006 8741 0.0 0.0 0.0
2007 8751 0.0 0.0 0.0
2008 8752 0.0 0.0 0.0
2009 8754 0.0 0.0 0.0
2010 8752 0.0 0.0 0.0
2011 8182 0.0 0.0 0.0
2012 8769 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8591 0.0 0.0 0.0
2015 1440 0.0 0.0 0.0

For data sources see[5]

References