If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0415030812002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.517728,"lon":-114.406444,"icon":""}]} |
| Location: 00/12-08-041-03W5/2 | |
| Location Alias: 00/12-08-41-03 W5M | |
| Location Alias 2: 00/12-08-041-03 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 041 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 08 | |
| County/Municipality: Lacombe County | |
| Well Name: CVE GILBY 12-8-41-3 | |
| Operator Name: Cenovus Energy Inc. | |
| License Number: 0011403 | |
| License Date: 1956-05-09 | |
| License Status: Suspension | |
| Spud Date: 1956-05-23 | |
| Final Drill Date: 1956-06-13 | |
| Well Total Depth: 2179.30 m | |
| Surface Hole Latitude: 52.517728 | |
| Surface Hole Longitude: -114.406444 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1956-05-09 | Obtained License |
| 1956-06-03 | Drill Stem Test Performed |
| 1956-06-10 | Drill Stem Test Performed |
| 1956-06-11 | Drill Stem Test Performed |
| 1956-06-13 | Finished Drilling |
| 1956-06-13 | Well Mode changed to Drilled and Cased |
| 1956-06-14 | Production Casing Operation Performed |
| 1956-06-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1956-06-29 | Perforation Treatment Performed - Acid Wash - No Pressure |
| 1956-06-29 | Perforation Treatment Performed - Bullet Perforation |
| 1956-07-03 | Perforation Treatment Performed - Cement Squeeze |
| 1956-07-04 | Perforation Treatment Performed - Bullet Perforation |
| 1956-07-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1956-07-05 | Perforation Treatment Performed - Bullet Perforation |
| 1956-07-05 | Perforation Treatment Performed - Cement Squeeze |
| 1992-09-11 | Perforation Treatment Performed - Cement Squeeze |
| 1992-09-16 | Perforation Treatment Performed - Jet Perforation |
| 1992-09-16 | Well Log Performed |
| 1992-09-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1992-09-22 | Well Log Performed |
| 1993-11-07 | Well Began Production |
| 1993-11-07 | Well Fluid changed to Gas |
| 1993-11-07 | Well Mode changed to Flowing |
| 1996-08-24 | Well Log Performed |
| 1996-08-28 | Perforation Treatment Performed - Jet Perforation |
| 1996-08-28 | Well Fluid changed to Gas |
| 1996-08-28 | Well Log Performed |
| 1996-08-28 | Well Mode changed to Flowing |
| 1996-08-29 | Perforation Treatment Performed - Fractured |
| 2003-01-01 | Well Fluid changed to Gas |
| 2003-01-01 | Well Mode changed to Pumping |
| 2008-07-31 | Well Fluid changed to Gas |
| 2008-07-31 | Well Mode changed to Suspended |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1956-06-29 | Bullet Perforation | 2146.40 | 2148.80 | 20 |
| 1992-09-16 | Perforation | 2130.00 | 2140.00 | 13 |
| 1992-09-16 | Perforation | 2145.20 | 2149.20 | 13 |
| 1992-09-18 | Acid Treatment | 2130.00 | 2149.20 | 0 |
| 1996-08-28 | Perforation | 2096.00 | 2100.00 | 17 |
| 1996-08-29 | Fracture | 2096.00 | 2100.00 | 0 |
| 1956-06-29 | Acid Wash | 2146.40 | 2148.80 | 0 |
| 1956-06-29 | Acid Treatment | 2146.40 | 2148.80 | 0 |
| 1956-07-03 | Cement Squeeze | 2146.40 | 2148.80 | 0 |
| 1956-07-04 | Bullet Perforation | 2154.90 | 2157.70 | 13 |
| 1956-07-05 | Acid Treatment | 2154.90 | 2157.70 | 0 |
| 1956-07-05 | Cement Squeeze | 2154.90 | 2157.70 | 0 |
| 1956-07-05 | Bullet Perforation | 1919.60 | 1923.30 | 20 |
| 1992-09-11 | Cement Squeeze | 1919.60 | 1923.30 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1993 | 1288 | 0.0 | 0.0 | 0.0 |
| 1994 | 4736 | 0.0 | 0.0 | 0.0 |
| 1995 | 3065 | 0.0 | 0.0 | 0.0 |
| 1996 | 6804 | 0.0 | 0.0 | 0.0 |
| 1997 | 7774 | 0.0 | 0.0 | 0.0 |
| 1998 | 7146 | 0.0 | 0.0 | 0.0 |
| 1999 | 3690 | 0.0 | 0.0 | 0.0 |
| 2000 | 6019 | 0.0 | 0.0 | 0.0 |
| 2001 | 5803 | 0.0 | 0.0 | 0.0 |
| 2002 | 5317 | 0.0 | 0.0 | 0.0 |
| 2003 | 6366 | 0.0 | 0.0 | 0.0 |
| 2004 | 7801 | 0.0 | 0.0 | 0.0 |
| 2005 | 8759 | 0.0 | 0.0 | 0.0 |
| 2006 | 5831 | 0.0 | 0.0 | 0.0 |
| 2007 | 8375 | 0.0 | 0.0 | 0.0 |
| 2008 | 3551 | 0.0 | 0.0 | 0.0 |
For data sources see[5]