X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415030812002

Well Details

Well ID: 0415030812002
Loading map...
Location: 00/12-08-041-03W5/2
Location Alias: 00/12-08-41-03 W5M
Location Alias 2: 00/12-08-041-03 W5/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 03
Section: 08
County/Municipality: Lacombe County
Well Name: CVE GILBY 12-8-41-3
Operator Name: Cenovus Energy Inc.
License Number: 0011403
License Date: 1956-05-09
License Status: Suspension
Spud Date: 1956-05-23
Final Drill Date: 1956-06-13
Well Total Depth: 2179.30 m
Surface Hole Latitude: 52.517728
Surface Hole Longitude: -114.406444

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1956-05-09 Obtained License
1956-06-03 Drill Stem Test Performed
1956-06-10 Drill Stem Test Performed
1956-06-11 Drill Stem Test Performed
1956-06-13 Finished Drilling
1956-06-13 Well Mode changed to Drilled and Cased
1956-06-14 Production Casing Operation Performed
1956-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-06-29 Perforation Treatment Performed - Acid Wash - No Pressure
1956-06-29 Perforation Treatment Performed - Bullet Perforation
1956-07-03 Perforation Treatment Performed - Cement Squeeze
1956-07-04 Perforation Treatment Performed - Bullet Perforation
1956-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-07-05 Perforation Treatment Performed - Bullet Perforation
1956-07-05 Perforation Treatment Performed - Cement Squeeze
1992-09-11 Perforation Treatment Performed - Cement Squeeze
1992-09-16 Perforation Treatment Performed - Jet Perforation
1992-09-16 Well Log Performed
1992-09-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-09-22 Well Log Performed
1993-11-07 Well Began Production
1993-11-07 Well Fluid changed to Gas
1993-11-07 Well Mode changed to Flowing
1996-08-24 Well Log Performed
1996-08-28 Perforation Treatment Performed - Jet Perforation
1996-08-28 Well Fluid changed to Gas
1996-08-28 Well Log Performed
1996-08-28 Well Mode changed to Flowing
1996-08-29 Perforation Treatment Performed - Fractured
2003-01-01 Well Fluid changed to Gas
2003-01-01 Well Mode changed to Pumping
2008-07-31 Well Fluid changed to Gas
2008-07-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1956-06-29 Bullet Perforation 2146.40 2148.80 20
1992-09-16 Perforation 2130.00 2140.00 13
1992-09-16 Perforation 2145.20 2149.20 13
1992-09-18 Acid Treatment 2130.00 2149.20 0
1996-08-28 Perforation 2096.00 2100.00 17
1996-08-29 Fracture 2096.00 2100.00 0
1956-06-29 Acid Wash 2146.40 2148.80 0
1956-06-29 Acid Treatment 2146.40 2148.80 0
1956-07-03 Cement Squeeze 2146.40 2148.80 0
1956-07-04 Bullet Perforation 2154.90 2157.70 13
1956-07-05 Acid Treatment 2154.90 2157.70 0
1956-07-05 Cement Squeeze 2154.90 2157.70 0
1956-07-05 Bullet Perforation 1919.60 1923.30 20
1992-09-11 Cement Squeeze 1919.60 1923.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 1288 0.0 0.0 0.0
1994 4736 0.0 0.0 0.0
1995 3065 0.0 0.0 0.0
1996 6804 0.0 0.0 0.0
1997 7774 0.0 0.0 0.0
1998 7146 0.0 0.0 0.0
1999 3690 0.0 0.0 0.0
2000 6019 0.0 0.0 0.0
2001 5803 0.0 0.0 0.0
2002 5317 0.0 0.0 0.0
2003 6366 0.0 0.0 0.0
2004 7801 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 5831 0.0 0.0 0.0
2007 8375 0.0 0.0 0.0
2008 3551 0.0 0.0 0.0

For data sources see[5]

References