X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415030501000

Well Details

Well ID: 0415030501000
Loading map...
Location: 00/01-05-041-03W5/0
Location Alias: 00/01-05-41-03 W5M
Location Alias 2: 00/01-05-041-03 W5/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 03
Section: 05
County/Municipality: Lacombe County
Well Name: CVE GILBY 1-5-41-3
Operator Name: Cenovus Energy Inc.
License Number: 0165570
License Date: 1994-03-03
License Status: Amended
Spud Date: 1994-03-13
Final Drill Date: 1994-03-21
Well Total Depth: 2180.00 m
Surface Hole Latitude: 52.497080
Surface Hole Longitude: -114.388842

For data sources see[1][2]

Well History

Date Event
1994-03-03 Obtained License
1994-03-15 Surface Casing Operation Performed
1994-03-21 Finished Drilling
1994-03-21 Well Mode changed to Drilled and Cased
1994-03-22 Well Log Performed
1994-03-23 Drill Stem Test Performed
1994-03-25 Production Casing Operation Performed
1994-03-25 Rig Released
1994-05-09 Well Log Performed
1994-05-11 Perforation Treatment Performed - Jet Perforation
1994-05-11 Well Log Performed
1994-05-12 Perforation Treatment Performed - Fractured
1994-06-09 Well Began Production
1994-06-09 Well Fluid changed to Crude Oil
1994-06-09 Well Mode changed to Pumping
1997-10-01 Well Fluid changed to Crude Oil
1997-10-01 Well Mode changed to Suspended
1998-11-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-05 Perforation Treatment Performed - Jet Perforation
1998-11-05 Plug Back Performed
1998-11-05 Well Fluid changed to Crude Oil
1998-11-05 Well Log Performed
1998-11-05 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-05-11 Perforation 2139.50 2149.50 13
1994-05-11 Perforation 2151.00 2153.00 13
1994-05-12 Fracture 2139.50 2153.00 0
1998-11-05 Packing Device Capped w/Cement 2136.50 2138.50 0
1998-11-05 Perforation 2120.00 2121.00 17
1998-11-05 Perforation 2122.00 2123.00 17
1998-11-05 Perforation 2124.50 2128.00 17
1998-11-05 Perforation 2129.00 2131.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 4538 0.0 0.0 0.0
1995 6757 0.0 0.0 0.0
1996 6275 0.0 0.0 0.0

For data sources see[5]

References