X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415030410002

Well Details

Well ID: 0415030410002
Loading map...
Location: 00/10-04-041-03W5/2
Location Alias: 00/10-04-41-03 W5M
Location Alias 2: 00/10-04-041-03 W5/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 03
Section: 04
County/Municipality: Lacombe County
Well Name: JOURNEY GILBY 10-4-41-3
Operator Name: Journey Energy Inc.
License Number: 0006741
License Date: 1953-07-14
License Status: Suspension
Spud Date: 1953-07-16
Final Drill Date: 1953-10-23
Well Total Depth: 2993.10 m
Surface Hole Latitude: 52.503243
Surface Hole Longitude: -114.370563

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-07-14 Obtained License
1953-08-25 Drill Stem Test Performed
1953-08-26 Drill Stem Test Performed
1953-08-27 Drill Stem Test Performed
1953-09-22 Drill Stem Test Performed
1953-09-27 Drill Stem Test Performed
1953-10-04 Drill Stem Test Performed
1953-10-23 Drill Stem Test Performed
1953-10-23 Finished Drilling
1953-10-23 Well Log Performed
1953-10-23 Well Mode changed to Drilled and Cased
1953-10-24 Production Casing Operation Performed
1953-10-25 Well Log Performed
1953-11-01 Perforation Treatment Performed - Selective Bullet Perforations
1953-11-02 Perforation Treatment Performed - Cement Squeeze
1953-11-03 Drill Stem Test Performed
1953-11-03 Perforation Treatment Performed - Bullet Perforation
1953-11-04 Perforation Treatment Performed - Cement Squeeze
1953-11-06 Drill Stem Test Performed
1953-11-06 Perforation Treatment Performed - Bullet Perforation
1953-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1954-11-01 Perforation Treatment Performed - Bullet Perforation
1967-11-02 Perforation Treatment Performed - Cement Squeeze
1971-03-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1971-04-02 Perforation Treatment Performed - Cement Squeeze
1971-05-07 Perforation Treatment Performed - Cement Squeeze
1971-05-09 Perforation Treatment Performed - Cement Squeeze
1971-05-11 Perforation Treatment Performed - Cement Squeeze
1971-05-12 Perforation Treatment Performed - Cement Squeeze
1971-05-18 Perforation Treatment Performed - Jet Perforation
1971-05-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-09-23 Well Began Production
1971-09-23 Well Fluid changed to Gas
1971-09-23 Well Mode changed to Flowing
1982-03-10 Perforation Treatment Performed - Jet Perforation
2004-03-01 Well Fluid changed to Gas
2004-03-01 Well Mode changed to Suspended
2012-03-07 Well Log Performed
2012-03-09 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2012-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-03-10 Plug Back Performed
2012-03-10 Well Fluid changed to Gas
2012-03-10 Well Mode changed to Abandoned Zone
2012-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-11-01 Selective Bullet Perforations 1252.70 1252.70 0
1971-04-02 Cement Squeeze 1899.50 1901.00 0
1971-04-02 Cement Squeeze 421.80 422.10 0
1971-05-07 Cement Squeeze 421.80 422.10 0
1971-05-09 Cement Squeeze 421.80 422.10 0
1971-05-11 Cement Squeeze 836.40 840.60 0
1971-05-12 Cement Squeeze 836.40 840.60 0
1971-05-18 Perforation 2116.80 2127.50 13
1971-05-22 Acid Treatment 2116.80 2127.50 0
1982-03-10 Perforation 2084.80 2087.90 7
1982-03-10 Perforation 2103.70 2104.60 7
1953-11-02 Cement Squeeze 1252.70 1252.70 0
2012-03-09 Packing Dev Cpd w/Res-Gyp Cem 2105.00 2108.00 0
2012-03-10 Packing Device Capped w/Cement 2063.00 2071.00 0
2012-03-11 Packing Device Capped w/Cement 1885.00 1893.00 0
1953-11-03 Bullet Perforation 1260.70 1262.20 13
1953-11-04 Cement Squeeze 1260.70 1262.20 0
1953-11-06 Bullet Perforation 1899.50 1901.00 13
1953-11-08 Acid Treatment 1899.50 1901.00 0
1954-11-01 Bullet Perforation 1917.20 1922.10 0
1967-11-02 Cement Squeeze 1899.50 1922.10 0
1971-03-30 Packing Device Capped w/Cement 2132.10 2132.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 2235 0.0 0.0 0.0
1972 7460 0.0 0.0 0.0
1973 7665 0.0 0.0 0.0
1974 7957 0.0 0.0 0.0
1975 7149 0.0 0.0 0.0
1976 5246 0.0 0.0 0.0
1977 4498 0.0 0.0 0.0
1978 1619 0.0 0.0 0.0
1979 2815 0.0 0.0 0.0
1980 1925 0.0 0.0 0.0
1981 1584 0.0 0.0 0.0
1982 4620 0.0 0.0 0.0
1983 807 0.0 0.0 0.0
1984 3615 0.0 0.0 0.0
1985 4605 0.0 0.0 0.0
1986 3504 0.0 0.0 0.0
1987 2854 0.0 0.0 0.0
1988 2123 0.0 0.0 0.0
1989 5641 0.0 0.0 0.0
1990 5445 0.0 0.0 0.0
1991 6342 0.0 0.0 0.0
1992 8130 0.0 0.0 0.0
1993 8415 0.0 0.0 0.0
1994 8221 0.0 0.0 0.0
1995 8441 0.0 0.0 0.0
1996 3417 0.0 0.0 0.0
1998 4183 0.0 0.0 0.0
1999 5072 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References