X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414273602000

Well Details

Well ID: 0414273602000
Loading map...
Location: 00/02-36-041-27W4/0
Location Alias: 00/02-36-41-27 W4M
Location Alias 2: 00/02-36-041-27 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 27
Section: 36
County/Municipality: Lacombe County
Well Name: JFEC MORNSIDE 2-36-41-27
Operator Name: Just Freehold Energy Corp.
License Number: 0393316
License Date: 2008-01-30
License Status: Issued
Spud Date: 2008-02-04
Final Drill Date: 2008-02-05
Well Total Depth: 653.00 m
Surface Hole Latitude: 52.566956
Surface Hole Longitude: -113.758795

For data sources see[1][2]

Well History

Date Event
2008-01-30 Obtained License
2008-02-04 Surface Casing Operation Performed
2008-02-05 Finished Drilling
2008-02-05 Production Casing Operation Performed
2008-02-05 Rig Released
2008-02-05 Well Mode changed to Drilled and Cased
2008-02-22 Well Log Performed
2008-03-04 Perforation Treatment Performed - Jet Perforation
2008-03-08 Perforation Treatment Performed - Fractured
2008-05-23 Well Began Production
2008-05-23 Well Fluid changed to Coalbed Methane-Coals Only
2008-05-23 Well Mode changed to Flowing
2012-08-03 Well Fluid changed to Coalbed Methane-Coals Only
2012-08-03 Well Mode changed to Suspended
2012-12-01 Well Fluid changed to Coalbed Methane-Coals Only
2012-12-01 Well Mode changed to Flowing
2016-06-20 Well Fluid changed to Coalbed Methane-Coals Only
2016-06-20 Well Mode changed to Suspended
2017-06-30 Well Fluid changed to Coalbed Methane-Coals Only
2017-06-30 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-03-04 Perforation 620.50 621.10 12
2008-03-04 Perforation 258.90 259.70 7
2008-03-04 Perforation 253.20 254.00 12
2008-03-04 Perforation 242.20 244.50 12
2008-03-08 Fracture 620.50 621.10 0
2008-03-08 Fracture 604.80 605.30 0
2008-03-08 Fracture 574.70 575.30 0
2008-03-08 Fracture 566.60 568.00 0
2008-03-08 Fracture 550.10 551.30 0
2008-03-08 Fracture 534.20 535.00 0
2008-03-08 Fracture 501.00 501.80 0
2008-03-04 Perforation 604.80 605.30 12
2008-03-08 Fracture 434.20 435.00 0
2008-03-08 Fracture 381.00 381.80 0
2008-03-08 Fracture 258.90 259.70 0
2008-03-08 Fracture 253.20 254.00 0
2008-03-08 Fracture 242.20 244.50 0
2008-03-04 Perforation 574.70 575.30 12
2008-03-04 Perforation 566.60 568.00 7
2008-03-04 Perforation 550.10 551.30 7
2008-03-04 Perforation 534.20 535.00 7
2008-03-04 Perforation 501.00 501.80 12
2008-03-04 Perforation 434.20 435.00 7
2008-03-04 Perforation 381.00 381.80 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 5292 0.0 0.0 0.0
2009 8335 0.0 0.0 0.0
2010 8576 0.0 0.0 0.0
2011 8435 0.0 0.0 0.0
2012 5590 0.0 0.0 0.0
2013 8031 0.0 0.0 0.0
2014 8429 0.0 0.0 0.0
2015 8703 0.0 0.0 0.0
2016 4083 0.0 0.0 0.0
2018 2181 0.0 0.0 0.0
2019 7571 0.0 0.0 0.0
2020 2091 0.0 0.0 0.0

For data sources see[5]

References