X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414253611002

Well Details

Well ID: 0414253611002
Loading map...
Location: 00/11-36-041-25W4/2
Location Alias: 00/11-36-41-25 W4M
Location Alias 2: 00/11-36-041-25 W4/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 25
Section: 36
County/Municipality: Lacombe County
Well Name: SABA ET AL CRAIGEND 11-36-41-25
Operator Name: Saba Energy Ltd.
License Number: 0034594
License Date: 1968-08-08
License Status: Abandoned
Spud Date: 1968-08-14
Final Drill Date: 1968-09-19
Well Total Depth: 1974.20 m
Surface Hole Latitude: 52.574346
Surface Hole Longitude: -113.476150

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1968-08-08 Obtained License
1968-08-14 Direction Drilling Operation Performed - 98
1968-09-19 Drill Stem Test Performed
1968-09-19 Finished Drilling
1968-09-19 Well Mode changed to Drilled and Cased
1968-09-20 Production Casing Operation Performed
1968-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-09-28 Perforation Treatment Performed - Jet Perforation
1968-09-28 Well Began Production
1968-09-28 Well Fluid changed to Crude Oil
1968-09-28 Well Mode changed to Flowing
1986-01-01 Well Fluid changed to Crude Oil
1986-01-01 Well Mode changed to Suspended
1988-02-01 Well Fluid changed to Crude Oil
1988-02-01 Well Mode changed to Pumping
1989-05-01 Well Fluid changed to Crude Oil
1989-05-01 Well Mode changed to Suspended
1991-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-07-26 Plug Back Performed
1991-07-26 Well Fluid changed to Crude Oil
1991-07-26 Well Mode changed to Abandoned
1991-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-07-27 Plug Back Performed
1991-07-28 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1968-08-14 1584.40 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-09-28 Perforation 1939.10 1941.60 7
1968-09-28 Acid Treatment 1939.10 1941.60 0
1991-07-26 Packing Device Capped w/Cement 1537.00 1545.00 0
1991-07-27 Packing Device Capped w/Cement 537.00 545.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 952 0.0 0.0 0.0
1969 5359 0.0 0.0 0.0
1970 5260 0.0 0.0 0.0
1971 4748 0.0 0.0 0.0
1972 6022 0.0 0.0 0.0
1973 7158 0.0 0.0 0.0
1974 8130 0.0 0.0 0.0
1975 6610 0.0 0.0 0.0
1976 6885 0.0 0.0 0.0
1977 8471 0.0 0.0 0.0
1978 8611 0.0 0.0 0.0
1979 8687 0.0 0.0 0.0
1980 7535 0.0 0.0 0.0
1981 8048 0.0 0.0 0.0
1982 8626 0.0 0.0 0.0
1983 7645 0.0 0.0 0.0
1984 8403 0.0 0.0 0.0
1985 8475 0.0 0.0 0.0
1988 832 0.0 0.0 0.0

For data sources see[6]

References