X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414242016030

Well Details

Well ID: 0414242016030
Loading map...
Location: 03/16-20-041-24W4/0
Location Alias: 03/16-20-41-24 W4M
Location Alias 2: 03/16-20-041-24 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 24
Section: 20
County/Municipality: Lacombe County
Well Name: GLENCOE 103 CHIGWELL 16-20-41-24
Operator Name: Lynx Energy ULC
License Number: 0436344
License Date: 2011-08-26
License Status: Issued
Spud Date: 2011-08-31
Final Drill Date: 2011-09-02
Well Total Depth: 702.00 m
Surface Hole Latitude: 52.547174
Surface Hole Longitude: -113.412253

For data sources see[1][2]

Well History

Date Event
2011-08-26 Obtained License
2011-09-01 Surface Casing Operation Performed
2011-09-02 Finished Drilling
2011-09-02 Production Casing Operation Performed
2011-09-02 Rig Released
2011-09-02 Well Mode changed to Drilled and Cased
2011-09-06 Well Log Performed
2011-09-16 Perforation Treatment Performed - Jet Perforation
2011-09-30 Perforation Treatment Performed - Fractured
2012-01-12 Well Began Production
2012-01-12 Well Fluid changed to Coalbed Methane-Coals and Other
2012-01-12 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-16 Perforation 563.00 567.50 17
2011-09-16 Perforation 452.00 453.00 13
2011-09-16 Perforation 444.50 445.00 13
2011-09-16 Perforation 421.80 422.80 13
2011-09-16 Perforation 412.40 412.90 13
2011-09-16 Perforation 398.20 399.20 13
2011-09-16 Perforation 385.20 385.70 13
2011-09-16 Perforation 359.80 361.80 17
2011-09-16 Perforation 335.80 336.30 13
2011-09-16 Perforation 307.00 308.00 17
2011-09-30 Fracture 563.00 567.50 0
2011-09-16 Perforation 525.50 526.00 13
2011-09-30 Fracture 525.50 526.00 0
2011-09-30 Fracture 517.00 518.00 0
2011-09-30 Fracture 509.20 509.70 0
2011-09-30 Fracture 504.00 504.50 0
2011-09-30 Fracture 498.50 499.00 0
2011-09-30 Fracture 489.90 490.90 0
2011-09-30 Fracture 478.90 479.90 0
2011-09-30 Fracture 466.10 467.60 0
2011-09-30 Fracture 452.00 453.00 0
2011-09-30 Fracture 444.50 445.00 0
2011-09-16 Perforation 517.00 518.00 13
2011-09-30 Fracture 421.80 422.80 0
2011-09-30 Fracture 412.40 412.90 0
2011-09-30 Fracture 398.20 399.20 0
2011-09-30 Fracture 385.20 385.70 0
2011-09-30 Fracture 359.80 361.80 0
2011-09-30 Fracture 335.80 336.30 0
2011-09-30 Fracture 307.00 308.00 0
2011-09-16 Perforation 509.20 509.70 13
2011-09-16 Perforation 504.00 504.50 13
2011-09-16 Perforation 498.50 499.00 13
2011-09-16 Perforation 489.90 490.90 13
2011-09-16 Perforation 478.90 479.90 13
2011-09-16 Perforation 466.10 467.60 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 8502 0.0 0.0 0.0
2013 8728 0.0 0.0 0.0
2014 8678 0.0 0.0 0.0
2015 8716 0.0 0.0 0.0
2016 8714 0.0 0.0 0.0
2017 7712 0.0 0.0 0.0
2018 8643 0.0 0.0 0.0
2019 8741 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References