X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414240807000

Well Details

Well ID: 0414240807000
Loading map...
Location: 00/07-08-041-24W4/0
Location Alias: 00/07-08-41-24 W4M
Location Alias 2: 00/07-08-041-24 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 24
Section: 08
County/Municipality: Lacombe County
Well Name: IMP UNIT CHIGWELL 7-8BQ-41-24
Operator Name: Imperial Oil Resources Limited
License Number: 0021543
License Date: 1961-10-18
License Status: RecCertified
Spud Date: 1961-11-03
Final Drill Date: 1961-11-21
Well Total Depth: 1881.20 m
Surface Hole Latitude: 52.512152
Surface Hole Longitude: -113.420487

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-10-18 Obtained License
1961-11-21 Finished Drilling
1961-11-23 Production Casing Operation Performed
1961-12-04 Well Mode changed to Drilled and Cased
1962-06-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-06-07 Perforation Treatment Performed - Jet Perforation
1962-11-24 Well Began Production
1962-11-24 Well Fluid changed to Gas
1962-11-24 Well Mode changed to Flowing
1974-10-03 Perforation Treatment Performed - Acid Wash - No Pressure
1974-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-05-06 Perforation Treatment Performed - Cement Squeeze
1976-05-14 Perforation Treatment Performed - Jet Perforation
1976-05-17 Perforation Treatment Performed - Acid Wash - No Pressure
1976-05-27 Perforation Treatment Performed - Fractured
1976-07-14 Perforation Treatment Performed - Cement Plug
1979-06-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-07-03 Perforation Treatment Performed - Cement Plug
1979-07-05 Well Abandoned
1979-07-05 Well Fluid changed to Gas
1979-07-05 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-06-07 Perforation 1575.80 1577.00 13
1976-07-14 Cement Plug 1568.20 1571.20 0
1979-06-29 Packing Device Capped w/Cement 1544.10 1560.00 0
1979-07-03 Cement Plug 291.10 350.50 0
1962-06-07 Acid Treatment 1575.80 1577.00 0
1974-10-03 Acid Wash 1575.80 1577.00 0
1974-10-04 Acid Treatment 1575.80 1577.00 0
1976-05-06 Cement Squeeze 1575.80 1577.00 0
1976-05-14 Perforation 1560.30 1563.00 7
1976-05-14 Perforation 1572.80 1577.00 7
1976-05-17 Acid Wash 1560.30 1577.00 0
1976-05-27 Fracture 1560.30 1577.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 1464 0.0 0.0 0.0
1969 6958 0.0 0.0 0.0
1970 3887 0.0 0.0 0.0
1971 3591 0.0 0.0 0.0
1972 8056 0.0 0.0 0.0
1973 8455 0.0 0.0 0.0
1974 8388 0.0 0.0 0.0
1975 8682 0.0 0.0 0.0
1976 2971 0.0 0.0 0.0

For data sources see[5]

References