X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414240502000

Well Details

Well ID: 0414240502000
Loading map...
Location: 00/02-05-041-24W4/0
Location Alias: 00/02-05-41-24 W4M
Location Alias 2: 00/02-05-041-24 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 24
Section: 05
County/Municipality: Lacombe County
Well Name: FAIRBORNE CLIVE 2-5-41-24
Operator Name: Tourmaline Oil Corp.
License Number: 0033215
License Date: 1967-12-11
License Status: Suspension
Spud Date: 1967-12-14
Final Drill Date: 1967-12-24
Well Total Depth: 1877.60 m
Surface Hole Latitude: 52.493561
Surface Hole Longitude: -113.421391

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1967-12-11 Obtained License
1967-12-22 Lost Circulation Occurred
1967-12-24 Finished Drilling
1967-12-24 Well Mode changed to Drilled and Cased
1967-12-27 Drill Stem Test Performed
1967-12-28 Production Casing Operation Performed
1968-01-05 Perforation Treatment Performed - Jet Perforation
1968-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-01-06 Well Began Production
1968-01-06 Well Fluid changed to Crude Oil
1968-01-06 Well Mode changed to Flowing
1988-09-13 Well Fluid changed to Crude Oil
1988-09-13 Well Mode changed to Pumping
1995-06-28 Well Log Performed
1998-05-08 Well Log Performed
1998-05-26 Perforation Treatment Performed - Jet Perforation
1998-05-26 Well Log Performed
1998-05-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-04-23 Well Log Performed
2001-08-05 Well Log Performed
2001-08-08 Perforation Treatment Performed - Cement Squeeze
2001-08-08 Plug Back Performed
2001-08-08 Well Fluid changed to Crude Oil
2001-08-08 Well Log Performed
2001-08-08 Well Mode changed to Abandoned Zone
2001-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-09 Perforation Treatment Performed - Jet Perforation
2001-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2004-01-13 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1968-01-05 Perforation 1862.30 1862.90 13
1968-01-06 Acid Treatment 1862.30 1862.90 0
1998-05-26 Perforation 1859.20 1863.00 13
1998-05-27 Acid Treatment 1859.20 1863.00 0
2001-08-08 Cement Squeeze 1862.30 1862.90 0
2001-08-09 Packing Device Capped w/Cement 1847.00 1855.00 0
2001-08-09 Perforation 1821.00 1825.50 13
2001-08-10 Acid Treatment 1821.00 1825.50 0
2004-01-13 Acid Treatment 1823.50 1825.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1968 2768 0.0 0.0 0.0
1969 5435 0.0 0.0 0.0
1970 3747 0.0 0.0 0.0
1971 648 0.0 0.0 0.0
1972 5510 0.0 0.0 0.0
1973 5686 0.0 0.0 0.0
1974 2059 0.0 0.0 0.0
1975 7843 0.0 0.0 0.0
1976 7224 0.0 0.0 0.0
1977 7537 0.0 0.0 0.0
1978 6268 0.0 0.0 0.0
1979 6936 0.0 0.0 0.0
1980 8283 0.0 0.0 0.0
1981 8735 0.0 0.0 0.0
1982 7636 0.0 0.0 0.0
1983 6543 0.0 0.0 0.0
1984 8228 0.0 0.0 0.0
1985 8753 0.0 0.0 0.0
1986 8571 0.0 0.0 0.0
1987 8404 0.0 0.0 0.0
1988 8584 0.0 0.0 0.0
1989 8186 0.0 0.0 0.0
1990 8398 0.0 0.0 0.0
1991 7850 0.0 0.0 0.0
1992 8303 0.0 0.0 0.0
1993 8092 0.0 0.0 0.0
1994 8470 0.0 0.0 0.0
1995 8328 0.0 0.0 0.0
1996 8456 0.0 0.0 0.0
1997 8349 0.0 0.0 0.0
1998 8346 0.0 0.0 0.0
1999 7679 0.0 0.0 0.0
2000 8674 0.0 0.0 0.0
2001 2168 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1967-12-22 Lost Circulation 1366.10 1366.10

For data sources see[6]

References