If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0414233003000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.554009,"lon":-113.30904,"icon":""}]} |
| Location: 00/03-30-041-23W4/0 | |
| Location Alias: 00/03-30-41-23 W4M | |
| Location Alias 2: 00/03-30-041-23 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 041 | |
| Meridian: 4 | |
| Range: 23 | |
| Section: 30 | |
| County/Municipality: Lacombe County | |
| Well Name: EMBER BASHAW 3-30-41-23 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0323513 | |
| License Date: 2005-01-07 | |
| License Status: Issued | |
| Spud Date: 2005-08-11 | |
| Final Drill Date: 2005-08-13 | |
| Well Total Depth: 804.00 m | |
| Surface Hole Latitude: 52.554009 | |
| Surface Hole Longitude: -113.309040 |
| Date | Event |
|---|---|
| 2005-01-07 | Obtained License |
| 2005-08-11 | Surface Casing Operation Performed |
| 2005-08-13 | Finished Drilling |
| 2005-08-13 | Production Casing Operation Performed |
| 2005-08-13 | Rig Released |
| 2005-08-13 | Well Mode changed to Drilled and Cased |
| 2005-09-01 | Perforation Treatment Performed - Jet Perforation |
| 2005-09-01 | Well Log Performed |
| 2005-09-17 | Perforation Treatment Performed - Fractured |
| 2005-10-06 | Well Began Production |
| 2005-10-06 | Well Fluid changed to Gas |
| 2005-10-06 | Well Mode changed to Flowing |
| 2008-10-24 | Perforation Treatment Performed - Jet Perforation |
| 2008-10-24 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2008-10-24 | Well Log Performed |
| 2008-10-24 | Well Mode changed to Flowing |
| 2008-10-28 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2005-09-01 | Perforation | 560.50 | 561.50 | 13 |
| 2005-09-01 | Perforation | 389.00 | 389.50 | 13 |
| 2005-09-01 | Perforation | 407.00 | 407.50 | 13 |
| 2005-09-01 | Perforation | 411.50 | 412.50 | 13 |
| 2005-09-01 | Perforation | 422.00 | 423.50 | 13 |
| 2005-09-01 | Perforation | 433.00 | 435.00 | 13 |
| 2005-09-01 | Perforation | 440.00 | 441.00 | 13 |
| 2005-09-17 | Fracture | 560.50 | 681.00 | 0 |
| 2005-09-17 | Fracture | 358.00 | 441.00 | 0 |
| 2008-10-24 | Perforation | 268.60 | 269.10 | 14 |
| 2008-10-24 | Perforation | 294.00 | 294.50 | 14 |
| 2005-09-01 | Perforation | 620.00 | 621.00 | 13 |
| 2008-10-24 | Perforation | 299.30 | 300.30 | 14 |
| 2008-10-24 | Perforation | 317.90 | 318.40 | 14 |
| 2008-10-24 | Perforation | 453.70 | 454.20 | 14 |
| 2008-10-24 | Perforation | 456.30 | 456.80 | 14 |
| 2008-10-24 | Perforation | 466.00 | 467.50 | 14 |
| 2008-10-24 | Perforation | 472.30 | 472.80 | 14 |
| 2008-10-24 | Perforation | 479.80 | 482.30 | 14 |
| 2008-10-24 | Perforation | 483.60 | 484.10 | 14 |
| 2008-10-24 | Perforation | 598.00 | 600.00 | 14 |
| 2008-10-28 | Fracture | 268.60 | 318.40 | 0 |
| 2005-09-01 | Perforation | 629.50 | 630.50 | 13 |
| 2008-10-28 | Fracture | 453.70 | 484.10 | 0 |
| 2008-10-28 | Fracture | 598.00 | 600.00 | 0 |
| 2005-09-01 | Perforation | 680.00 | 681.00 | 13 |
| 2005-09-01 | Perforation | 358.00 | 358.50 | 13 |
| 2005-09-01 | Perforation | 368.00 | 368.50 | 13 |
| 2005-09-01 | Perforation | 378.50 | 380.00 | 13 |
| 2005-09-01 | Perforation | 383.00 | 383.50 | 13 |
| 2005-09-01 | Perforation | 385.50 | 386.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2005 | 1265 | 0.0 | 0.0 | 0.0 |
| 2006 | 8758 | 0.0 | 0.0 | 0.0 |
| 2007 | 1106 | 0.0 | 0.0 | 0.0 |
| 2008 | 1565 | 0.0 | 0.0 | 0.0 |
| 2009 | 8449 | 0.0 | 0.0 | 0.0 |
| 2010 | 8625 | 0.0 | 0.0 | 0.0 |
| 2011 | 8213 | 0.0 | 0.0 | 0.0 |
| 2012 | 8347 | 0.0 | 0.0 | 0.0 |
| 2013 | 8406 | 0.0 | 0.0 | 0.0 |
| 2014 | 8314 | 0.0 | 0.0 | 0.0 |
| 2015 | 8632 | 0.0 | 0.0 | 0.0 |
| 2016 | 8301 | 0.0 | 0.0 | 0.0 |
| 2017 | 8247 | 0.0 | 0.0 | 0.0 |
| 2018 | 8341 | 0.0 | 0.0 | 0.0 |
| 2019 | 7883 | 0.0 | 0.0 | 0.0 |
| 2020 | 1948 | 0.0 | 0.0 | 0.0 |
For data sources see[5]