X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414232812000

Well Details

Well ID: 0414232812000
Loading map...
Location: 00/12-28-041-23W4/0
Location Alias: 00/12-28-41-23 W4M
Location Alias 2: 00/12-28-041-23 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 23
Section: 28
County/Municipality: Lacombe County
Well Name: CALAHOO ET AL BASHAW 12-28-41-23
Operator Name: Sahara Energy Ltd.
License Number: 0134140
License Date: 1988-06-03
License Status: Abandoned
Spud Date: 1988-06-03
Final Drill Date: 1988-06-11
Well Total Depth: 1850.00 m
Surface Hole Latitude: 52.560056
Surface Hole Longitude: -113.261702

For data sources see[1][2]

Well History

Date Event
1988-06-03 Obtained License
1988-06-04 Surface Casing Operation Performed
1988-06-11 Finished Drilling
1988-06-11 Well Mode changed to Drilled and Cased
1988-06-12 Well Log Performed
1988-06-13 Production Casing Operation Performed
1988-06-14 Rig Released
1988-07-06 Perforation Treatment Performed - Jet Perforation
1988-07-09 Well Began Production
1988-07-09 Well Fluid changed to Crude Oil
1988-07-09 Well Mode changed to Pumping
1988-07-13 Well Fluid changed to Crude Oil
1988-07-13 Well Mode changed to Suspended
1988-12-10 Well Fluid changed to Crude Oil
1988-12-10 Well Mode changed to Flowing
1988-12-23 Well Fluid changed to Crude Oil
1988-12-23 Well Mode changed to Suspended
1989-06-27 Well Fluid changed to Crude Oil
1989-06-27 Well Mode changed to Flowing
1990-05-20 Well Fluid changed to Crude Oil
1990-05-20 Well Mode changed to Pumping
2001-10-01 Well Fluid changed to Crude Oil
2001-10-01 Well Mode changed to Suspended
2002-06-27 Perforation Treatment Performed - Jet Perforation
2002-06-27 Well Log Performed
2002-06-29 Perforation Treatment Performed - Jet Perforation
2002-06-29 Well Log Performed
2002-07-05 Well Fluid changed to Crude Oil
2002-07-05 Well Mode changed to Pumping
2003-06-29 Well Log Performed
2006-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-10 Plug Back Performed
2006-07-10 Well Fluid changed to Crude Oil
2006-07-10 Well Mode changed to Abandoned Zone
2006-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-12 Perforation Treatment Performed - Jet Perforation
2006-07-12 Perforation Treatment Performed - Remedial Casing
2006-07-13 Perforation Treatment Performed - Cement Plug
2006-07-13 Perforation Treatment Performed - Jet Perforation
2006-07-13 Perforation Treatment Performed - Remedial Casing
2006-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-15 Perforation Treatment Performed - Jet Perforation
2006-07-15 Perforation Treatment Performed - Remedial Casing
2006-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-17 Perforation Treatment Performed - Jet Perforation
2006-07-17 Perforation Treatment Performed - Remedial Casing
2006-07-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-18 Perforation Treatment Performed - Jet Perforation
2006-07-18 Perforation Treatment Performed - Remedial Casing
2006-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-19 Perforation Treatment Performed - Jet Perforation
2006-07-19 Perforation Treatment Performed - Remedial Casing
2006-07-21 Well Abandoned
2006-07-21 Well Fluid changed to Crude Oil
2006-07-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-07-06 Perforation 1784.00 1785.00 13
2006-07-13 Cement Plug 663.00 694.80 0
2006-07-15 Perforation 574.50 575.50 17
2006-07-15 Remedial Casing Cementing 574.50 575.50 0
2006-07-15 Packing Device Capped w/Cement 560.50 569.50 0
2006-07-17 Perforation 490.00 491.00 14
2006-07-17 Remedial Casing Cementing 490.00 491.00 0
2006-07-17 Packing Device Capped w/Cement 476.00 485.00 0
2006-07-17 Perforation 414.00 415.00 14
2006-07-17 Remedial Casing Cementing 414.00 415.00 0
2006-07-17 Packing Device Capped w/Cement 401.00 410.00 0
2002-06-27 Perforation 1782.70 1783.40 17
2006-07-18 Perforation 386.00 387.00 13
2006-07-18 Remedial Casing Cementing 386.00 387.00 0
2006-07-18 Packing Device Capped w/Cement 372.00 381.00 0
2006-07-19 Perforation 346.00 347.00 13
2006-07-19 Remedial Casing Cementing 346.00 347.00 0
2006-07-19 Packing Device Capped w/Cement 338.00 340.00 0
2002-06-29 Perforation 1779.00 1780.50 13
2006-07-10 Packing Device Capped w/Cement 1761.00 1769.00 0
2006-07-12 Perforation 725.00 726.00 17
2006-07-12 Remedial Casing Cementing 725.00 726.00 0
2006-07-12 Packing Device Capped w/Cement 712.00 721.00 0
2006-07-13 Perforation 680.00 681.00 17
2006-07-13 Remedial Casing Cementing 680.00 681.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 639 0.0 0.0 0.0
1989 4193 0.0 0.0 0.0
1990 5479 0.0 0.0 0.0
1991 7169 0.0 0.0 0.0
1992 7616 0.0 0.0 0.0
1993 7260 0.0 0.0 0.0
1994 7872 0.0 0.0 0.0
1995 7534 0.0 0.0 0.0
1996 8414 0.0 0.0 0.0
1997 7598 0.0 0.0 0.0
1998 7736 0.0 0.0 0.0
1999 7698 0.0 0.0 0.0
2000 5154 0.0 0.0 0.0
2002 3955 0.0 0.0 0.0
2003 6592 0.0 0.0 0.0
2004 7485 0.0 0.0 0.0
2005 3508 0.0 0.0 0.0

For data sources see[5]

References