X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414231108000

Well Details

Well ID: 0414231108000
Loading map...
Location: 00/08-11-041-23W4/0
Location Alias: 00/08-11-41-23 W4M
Location Alias 2: 00/08-11-041-23 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 23
Section: 11
County/Municipality: Lacombe County
Well Name: RALLYCANADA BASHAW 8-11-41-23
Operator Name: Rally Canada Resources Ltd.
License Number: 0148839
License Date: 1991-05-10
License Status: Suspension
Spud Date: 1991-06-05
Final Drill Date: 1991-06-17
Well Total Depth: 1800.00 m
Surface Hole Latitude: 52.514798
Surface Hole Longitude: -113.196403

For data sources see[1][2]

Well History

Date Event
1991-05-10 Obtained License
1991-06-06 Surface Casing Operation Performed
1991-06-08 Well Log Performed
1991-06-09 Direction Drilling Operation Performed - Deviate
1991-06-17 Finished Drilling
1991-06-17 Well Log Performed
1991-06-18 Well Log Performed
1991-06-19 Drill Stem Test Performed
1991-06-20 Production Casing Operation Performed
1991-06-21 Rig Released
1991-06-21 Well Mode changed to Drilled and Cased
1992-04-15 Perforation Treatment Performed - Jet Perforation
1992-04-15 Well Began Production
1992-04-15 Well Fluid changed to Crude Oil
1992-04-15 Well Log Performed
1992-04-15 Well Mode changed to Pumping
1992-04-16 Perforation Treatment Performed - Fractured
1993-06-18 Well Fluid changed to Crude Oil
1993-06-18 Well Mode changed to Suspended
1993-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-25 Well Fluid changed to Crude Oil
1993-06-25 Well Mode changed to Abandoned Zone
1993-06-26 Perforation Treatment Performed - Jet Perforation
1993-06-26 Well Log Performed
2005-09-21 Well Log Performed
2005-09-22 Perforation Treatment Performed - Cement Squeeze
2005-09-22 Perforation Treatment Performed - Jet Perforation
2005-09-22 Well Log Performed
2015-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-12-16 Plug Back Performed
2015-12-16 Well Log Performed
2015-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-12-18 Plug Back Performed
2015-12-18 Well Log Performed
2015-12-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-12-20 Plug Back Performed
2015-12-20 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1991-06-09 1261.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-04-15 Perforation 1755.00 1763.00 13
2015-12-18 Packing Device Capped w/Cement 1390.00 1398.00 0
2015-12-20 Packing Device Capped w/Cement 997.00 1005.00 0
1992-04-16 Fracture 1755.00 1763.00 0
1993-06-25 Packing Device Capped w/Cement 1743.00 1751.00 0
1993-06-26 Perforation 1457.00 1479.00 18
1993-06-26 Perforation 1481.00 1483.00 18
1993-06-26 Perforation 1487.00 1498.00 18
2005-09-22 Perforation 260.00 261.00 17
2005-09-22 Cement Squeeze 260.00 261.00 0
2015-12-16 Packing Device Capped w/Cement 1439.00 1447.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 5020 0.0 0.0 0.0
1993 4012 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-12-14 No Incident Encountered 0.00 0.00

For data sources see[7]

References