X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414223109000

Well Details

Well ID: 0414223109000
Loading map...
Location: 00/09-31-041-22W4/0
Location Alias: 00/09-31-41-22 W4M
Location Alias 2: 00/09-31-041-22 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 22
Section: 31
County/Municipality: Lacombe County
Well Name: SUPREME BASHAW 9-31-41-22
Operator Name: Supreme Energy Inc.
License Number: 0003290
License Date: 1951-08-07
License Status: Abandoned
Spud Date: 1951-08-11
Final Drill Date: 1951-09-24
Well Total Depth: 1763.40 m
Surface Hole Latitude: 52.573763
Surface Hole Longitude: -113.150834

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-08-07 Obtained License
1951-09-24 Finished Drilling
1951-09-24 Well Mode changed to Drilled and Cased
1951-09-27 Production Casing Operation Performed
1951-10-01 Drill Stem Test Performed
1951-10-04 Perforation Treatment Performed - Bullet Perforation
1951-10-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-10-14 Perforation Treatment Performed - Cement Squeeze
1951-10-17 Perforation Treatment Performed - Jet Perforation
1951-10-18 Perforation Treatment Performed - Jet Perforation
1951-10-19 Drill Stem Test Performed
1951-10-22 Perforation Treatment Performed - Jet Perforation
1951-11-26 Well Began Production
1951-11-26 Well Fluid changed to Crude Oil
1951-11-26 Well Mode changed to Flowing
1985-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-09 Well Fluid changed to Crude Oil
1988-09-09 Well Mode changed to Pumping
1994-03-01 Well Fluid changed to Crude Oil
1994-03-01 Well Mode changed to Suspended
1994-05-24 Well Log Performed
1994-05-25 Well Fluid changed to Crude Oil
1994-05-25 Well Mode changed to Pumping
1994-05-26 Perforation Treatment Performed - Cement Squeeze
1994-05-26 Plug Back Performed
1994-05-27 Well Log Performed
1994-05-28 Perforation Treatment Performed - Jet Perforation
1994-05-28 Perforation Treatment Performed - Open-Hole Completion
1994-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-01 Well Fluid changed to Crude Oil
1997-12-01 Well Mode changed to Suspended
2007-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-23 Perforation Treatment Performed - Jet Perforation
2007-01-23 Plug Back Performed
2007-01-23 Well Fluid changed to Crude Oil
2007-01-23 Well Log Performed
2007-01-23 Well Mode changed to Abandoned Zone
2007-01-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-24 Perforation Treatment Performed - Remedial Casing
2007-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-25 Perforation Treatment Performed - Jet Perforation
2007-01-26 Perforation Treatment Performed - Jet Perforation
2007-01-29 Perforation Treatment Performed - Remedial Casing
2007-02-02 Well Abandoned
2007-02-02 Well Fluid changed to Crude Oil
2007-02-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-10-04 Bullet Perforation 1760.80 1761.40 0
1994-05-28 Perforation 1762.50 1763.10 13
1994-05-31 Acid Treatment 1761.70 1763.40 0
2007-01-23 Packing Device Capped w/Cement 1745.00 1753.00 0
2007-01-23 Perforation 1323.00 1324.00 14
2007-01-24 Remedial Casing Cementing 1323.00 1324.00 0
2007-01-24 Packing Device Capped w/Cement 1304.00 1319.00 0
2007-01-25 Perforation 1271.00 1272.00 14
2007-01-25 Packing Device Capped w/Cement 1257.00 1265.00 0
2007-01-25 Perforation 1141.00 1142.00 14
2007-01-25 Packing Device Capped w/Cement 1127.00 1135.00 0
1951-10-13 Acid Treatment 1760.80 1761.40 0
2007-01-26 Perforation 413.00 414.00 14
2007-01-29 Remedial Casing Cementing 413.00 414.00 0
1951-10-14 Cement Squeeze 1760.80 1761.40 0
1951-10-17 Perforation 1760.50 1760.80 13
1951-10-18 Perforation 1760.20 1760.50 13
1951-10-22 Perforation 1759.90 1760.50 7
1985-07-05 Acid Treatment 1759.90 1760.80 0
1994-05-26 Cement Squeeze 1759.90 1760.80 0
1994-05-28 Open Hole/Barefoot Completion 1761.70 1763.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5397 0.0 0.0 0.0
1968 4179 0.0 0.0 0.0
1969 3652 0.0 0.0 0.0
1970 2434 0.0 0.0 0.0
1971 2237 0.0 0.0 0.0
1972 2549 0.0 0.0 0.0
1973 3917 0.0 0.0 0.0
1974 1935 0.0 0.0 0.0
1975 3623 0.0 0.0 0.0
1976 1217 0.0 0.0 0.0
1977 1171 0.0 0.0 0.0
1978 235 0.0 0.0 0.0
1981 15 0.0 0.0 0.0
1982 5778 0.0 0.0 0.0
1983 8027 0.0 0.0 0.0
1984 8069 0.0 0.0 0.0
1985 7172 0.0 0.0 0.0
1986 8587 0.0 0.0 0.0
1987 8457 0.0 0.0 0.0
1988 8618 0.0 0.0 0.0
1989 8456 0.0 0.0 0.0
1990 8709 0.0 0.0 0.0
1991 8187 0.0 0.0 0.0
1992 8611 0.0 0.0 0.0
1993 8127 0.0 0.0 0.0
1994 3363 0.0 0.0 0.0

For data sources see[5]

References