0414222010000

Well Details

Well ID: 0414222010000
Loading map...
Location: 00/10-20-041-22W4/0
Location Alias: 00/10-20-41-22 W4M
Location Alias 2: 00/10-20-041-22 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 22
Section: 20
County/Municipality: Lacombe County
Well Name: SUPREME BASHAW 10-20-41-22
Operator Name: Supreme Energy Inc.
License Number: 0028485
License Date: 1965-06-28
License Status: Issued
Spud Date: 1965-07-04
Final Drill Date: 1965-07-16
Well Total Depth: 1770.90 m
Surface Hole Latitude: 52.544840
Surface Hole Longitude: -113.132680

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-06-28 Obtained License
1965-07-04 Lost Circulation Occurred
1965-07-16 Finished Drilling
1965-07-16 Well Mode changed to Drilled and Cased
1965-07-18 Drill Stem Test Performed
1965-07-19 Production Casing Operation Performed
1965-08-04 Perforation Treatment Performed - Selective Jet Perforations
1965-08-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-08-06 Well Began Production
1965-08-06 Well Fluid changed to Crude Oil
1965-08-06 Well Mode changed to Flowing
1968-07-19 Well Fluid changed to Crude Oil
1968-07-19 Well Mode changed to Suspended
1975-06-10 Well Fluid changed to Crude Oil
1975-06-10 Well Mode changed to Flowing
1981-01-21 Well Fluid changed to Crude Oil
1981-01-21 Well Mode changed to Pumping
1984-03-07 Perforation Treatment Performed - Cement Squeeze
1984-03-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-03-09 Perforation Treatment Performed - Jet Perforation
1986-04-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-05-01 Perforation Treatment Performed - Cement Squeeze
1986-05-02 Perforation Treatment Performed - Jet Perforation
1986-05-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-05-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-08-01 Well Fluid changed to Crude Oil
1987-08-01 Well Mode changed to Suspended
1991-03-21 Well Fluid changed to Crude Oil
1991-03-21 Well Mode changed to Pumping
1995-03-30 Well Log Performed
1995-03-31 Perforation Treatment Performed - Jet Perforation
1995-04-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-12-09 Perforation Treatment Performed - Cement Squeeze
2000-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-01-07 Perforation Treatment Performed - Jet Perforation
2000-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-02-01 Well Fluid changed to Crude Oil
2003-02-01 Well Mode changed to Suspended
2003-08-23 Perforation Treatment Performed - Jet Perforation
2003-08-23 Well Log Performed
2003-08-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-10-13 Well Fluid changed to Crude Oil
2003-10-13 Well Mode changed to Pumping
2011-02-28 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-08-04 Selective Jet Perforations 1748.60 1748.60 0
1986-05-03 Acid Treatment 1747.40 1748.10 0
1986-05-17 Acid Treatment 1747.40 1748.10 0
1995-03-31 Perforation 1746.50 1747.40 14
1995-04-01 Acid Treatment 1746.50 1748.10 0
1999-12-09 Cement Squeeze 1746.50 1748.10 0
2000-01-07 Perforation 1745.20 1745.70 13
2000-01-07 Acid Treatment 1745.20 1745.70 0
2000-08-24 Acid Treatment 1745.20 1745.70 0
2003-08-23 Perforation 1745.20 1745.70 13
2003-08-23 Perforation 1745.90 1746.80 13
1965-08-05 Acid Treatment 1748.60 1748.60 0
2003-08-24 Acid Treatment 1745.20 1746.80 0
2011-02-28 Perforation 1742.20 1744.40 17
1984-03-07 Cement Squeeze 1748.60 1748.60 0
1984-03-09 Perforation 1745.90 1746.80 13
1984-03-09 Acid Treatment 1745.90 1746.80 0
1986-04-30 Acid Treatment 1745.90 1746.80 0
1986-05-01 Acid Treatment 1745.90 1746.80 0
1986-05-01 Cement Squeeze 1745.90 1746.80 0
1986-05-02 Perforation 1747.40 1748.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 720 0.0 0.0 0.0
1975 1277 0.0 0.0 0.0
1976 2384 0.0 0.0 0.0
1977 2463 0.0 0.0 0.0
1978 1873 0.0 0.0 0.0
1979 2891 0.0 0.0 0.0
1980 721 0.0 0.0 0.0
1981 2622 0.0 0.0 0.0
1982 1649 0.0 0.0 0.0
1983 1692 0.0 0.0 0.0
1984 6247 0.0 0.0 0.0
1985 8015 0.0 0.0 0.0
1986 2847 0.0 0.0 0.0
1991 3440 0.0 0.0 0.0
1992 5761 0.0 0.0 0.0
1993 2266 0.0 0.0 0.0
1994 5550 0.0 0.0 0.0
1995 5380 0.0 0.0 0.0
1996 7997 0.0 0.0 0.0
1997 6056 0.0 0.0 0.0
1998 7454 0.0 0.0 0.0
1999 6033 0.0 0.0 0.0
2000 3048 0.0 0.0 0.0
2001 719 0.0 0.0 0.0
2003 1726 0.0 0.0 0.0
2004 8468 0.0 0.0 0.0
2005 8253 0.0 0.0 0.0
2006 8611 0.0 0.0 0.0
2007 6409 0.0 0.0 0.0
2008 7427 0.0 0.0 0.0
2009 8755 0.0 0.0 0.0
2010 6271 0.0 0.0 0.0
2011 5618 0.0 0.0 0.0
2012 7581 0.0 0.0 0.0
2013 8732 0.0 0.0 0.0
2014 7248 0.0 0.0 0.0
2015 3454 0.0 0.0 0.0
2016 908 0.0 0.0 0.0
2017 5048 0.0 0.0 0.0
2018 4844 0.0 0.0 0.0
2019 4360 0.0 0.0 0.0
2020 744 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1965-07-04 Lost Circulation 0.10 183.20

For data sources see[6]