If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414170911004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.517095,"lon":-112.392519,"icon":""}]} |
Location: 00/11-09-041-17W4/4 | |
Location Alias: 00/11-09-41-17 W4M | |
Location Alias 2: 00/11-09-041-17 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 17 | |
Section: 09 | |
County/Municipality: County of Stettler No. 6 | |
Well Name: SIGNALTA RED WILLOW 11-9-41-17 | |
Operator Name: Signalta Resources Limited | |
License Number: 0140131 | |
License Date: 1989-06-14 | |
License Status: Re-Entered | |
Spud Date: 1989-06-18 | |
Final Drill Date: 1989-06-22 | |
Well Total Depth: 1225.00 m | |
Surface Hole Latitude: 52.517095 | |
Surface Hole Longitude: -112.392519 |
Date | Event |
---|---|
1989-06-14 | Obtained License |
1989-06-18 | Surface Casing Operation Performed |
1989-06-21 | Well Log Performed |
1989-06-22 | Finished Drilling |
1989-06-22 | Production Casing Operation Performed |
1989-06-22 | Rig Released |
1989-06-22 | Well Mode changed to Drilled and Cased |
1989-07-10 | Perforation Treatment Performed - Jet Perforation |
1989-07-10 | Well Log Performed |
1989-07-13 | Perforation Treatment Performed - Jet Perforation |
1989-07-13 | Well Log Performed |
1990-01-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-01-23 | Plug Back Performed |
1990-01-23 | Well Log Performed |
1995-03-16 | Perforation Treatment Performed - Cement Squeeze |
1995-03-16 | Plug Back Performed |
1995-03-18 | Perforation Treatment Performed - Jet Perforation |
1995-03-18 | Well Log Performed |
1995-12-19 | Well Log Performed |
1995-12-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-12-20 | Perforation Treatment Performed - Jet Perforation |
1995-12-20 | Plug Back Performed |
1995-12-23 | Well Began Production |
1995-12-23 | Well Fluid changed to Gas |
1995-12-23 | Well Mode changed to Flowing |
1997-11-30 | Well Fluid changed to Gas |
1997-11-30 | Well Mode changed to Suspended |
1998-05-01 | Well Fluid changed to Gas |
1998-05-01 | Well Mode changed to Flowing |
1998-07-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-07-17 | Perforation Treatment Performed - Jet Perforation |
1998-07-17 | Plug Back Performed |
1998-07-17 | Well Log Performed |
1998-07-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1998-07-18 | Plug Back Performed |
1998-07-18 | Well Fluid changed to Gas |
1998-07-18 | Well Log Performed |
1998-07-18 | Well Mode changed to Abandoned Zone |
1998-07-27 | Well Abandoned |
1998-07-27 | Well Fluid changed to Gas |
1998-07-27 | Well Mode changed to Abandoned |
1998-07-28 | Well Fluid changed to Gas |
1998-07-28 | Well Mode changed to Abandoned and Re-entered |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1989-07-10 | Perforation | 1176.50 | 1177.00 | 13 |
1998-07-17 | Perforation | 996.50 | 998.50 | 13 |
1998-07-18 | Packing Device Capped w/Cement | 985.00 | 993.00 | 0 |
1989-07-13 | Perforation | 1127.50 | 1129.00 | 13 |
1990-01-23 | Packing Device Capped w/Cement | 1167.00 | 1175.00 | 0 |
1995-03-16 | Cement Squeeze | 1127.00 | 1129.00 | 0 |
1995-03-18 | Perforation | 1162.00 | 1163.00 | 13 |
1995-12-20 | Packing Device Capped w/Cement | 1152.00 | 1160.00 | 0 |
1995-12-20 | Perforation | 1139.50 | 1141.00 | 14 |
1995-12-20 | Perforation | 1144.00 | 1145.50 | 14 |
1998-07-17 | Packing Device Capped w/Cement | 1117.00 | 1125.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 172 | 0.0 | 0.0 | 0.0 |
1996 | 4522 | 0.0 | 0.0 | 0.0 |
1997 | 2090 | 0.0 | 0.0 | 0.0 |
1998 | 908 | 0.0 | 0.0 | 0.0 |
For data sources see[5]