X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414131114020

Well Details

Well ID: 0414131114020
Loading map...
Location: 02/14-11-041-13W4/0
Location Alias: 02/14-11-41-13 W4M
Location Alias 2: 02/14-11-041-13 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 13
Section: 11
County/Municipality: Flagstaff County
Well Name: CPEC KILLAM 14-11-41-13
Operator Name: Crescent Point Energy Corp.
License Number: 0211841
License Date: 1998-01-13
License Status: RecCertified
Spud Date: 1998-02-22
Final Drill Date: 1998-03-03
Well Total Depth: 1480.00 m
Surface Hole Latitude: 52.514820
Surface Hole Longitude: -111.775075

For data sources see[1][2]

Well History

Date Event
1997-11-22 Well Log Performed
1998-01-13 Obtained License
1998-02-22 Surface Casing Operation Performed
1998-02-24 Direction Drilling Operation Performed - Horizontal
1998-02-27 Well Log Performed
1998-03-01 Perforation Treatment Performed - Open-Hole Completion
1998-03-01 Production Casing Operation Performed
1998-03-03 Finished Drilling
1998-03-03 Well Mode changed to Drilled and Cased
1998-03-04 Rig Released
1998-03-12 Well Began Production
1998-03-12 Well Fluid changed to Crude Oil
1998-03-12 Well Mode changed to Pumping
2002-06-30 Well Fluid changed to Crude Oil
2002-06-30 Well Mode changed to Suspended
2011-06-16 Well Fluid changed to Crude Oil
2011-06-16 Well Mode changed to Pumping
2011-06-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-06-17 Plug Back Performed
2011-06-17 Well Fluid changed to Crude Oil
2011-06-17 Well Mode changed to Abandoned Zone
2011-07-26 Well Abandoned
2011-07-26 Well Fluid changed to Crude Oil
2011-07-26 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1998-02-24 800.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-03-01 Open Hole/Barefoot Completion 1239.20 1480.00 0
2011-06-17 Packing Device Capped w/Cement 930.00 946.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 6695 0.0 0.0 0.0
1999 5446 0.0 0.0 0.0
2011 1 0.0 0.0 0.0

For data sources see[6]

References