If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0414130106000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.499052,"lon":-111.744991,"icon":""}]} |
| Location: 00/06-01-041-13W4/0 | |
| Location Alias: 00/06-01-41-13 W4M | |
| Location Alias 2: 00/06-01-041-13 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 041 | |
| Meridian: 4 | |
| Range: 13 | |
| Section: 01 | |
| County/Municipality: Flagstaff County | |
| Well Name: LONG RUN KILLAM 6-1-41-13 | |
| Operator Name: Long Run Exploration Ltd. | |
| License Number: 0105291 | |
| License Date: 1984-01-16 | |
| License Status: Abandoned | |
| Spud Date: 1984-02-04 | |
| Final Drill Date: 1984-02-07 | |
| Well Total Depth: 1019.00 m | |
| Surface Hole Latitude: 52.499052 | |
| Surface Hole Longitude: -111.744991 |
| Date | Event |
|---|---|
| 1984-01-16 | Obtained License |
| 1984-02-07 | Finished Drilling |
| 1984-02-07 | Well Log Performed |
| 1984-02-08 | Drill Stem Test Performed |
| 1984-02-09 | Production Casing Operation Performed |
| 1984-02-09 | Well Mode changed to Drilled and Cased |
| 1984-07-18 | Well Log Performed |
| 1984-07-19 | Perforation Treatment Performed - Jet Perforation |
| 1997-02-03 | Well Began Production |
| 1997-02-03 | Well Fluid changed to Gas |
| 1997-02-03 | Well Mode changed to Flowing |
| 2003-12-01 | Well Fluid changed to Gas |
| 2003-12-01 | Well Mode changed to Suspended |
| 2007-02-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-02-20 | Plug Back Performed |
| 2007-02-20 | Well Fluid changed to Gas |
| 2007-02-20 | Well Log Performed |
| 2007-02-20 | Well Mode changed to Abandoned Zone |
| 2007-02-21 | Well Abandoned |
| 2007-02-21 | Well Fluid changed to Gas |
| 2007-02-21 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1984-07-19 | Perforation | 802.00 | 805.00 | 13 |
| 2007-02-20 | Packing Device Capped w/Cement | 790.00 | 798.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1997 | 6086 | 0.0 | 0.0 | 0.0 |
| 1998 | 6910 | 0.0 | 0.0 | 0.0 |
| 1999 | 7301 | 0.0 | 0.0 | 0.0 |
| 2000 | 6464 | 0.0 | 0.0 | 0.0 |
| 2001 | 7678 | 0.0 | 0.0 | 0.0 |
| 2002 | 6929 | 0.0 | 0.0 | 0.0 |
| 2003 | 6804 | 0.0 | 0.0 | 0.0 |
For data sources see[5]