X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414123108050

Well Details

Well ID: 0414123108050
Loading map...
Location: 05/08-31-041-12W4/0
Location Alias: 05/08-31-41-12 W4M
Location Alias 2: 05/08-31-041-12 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 12
Section: 31
County/Municipality: Flagstaff County
Well Name: KELES ET AL BELL 8D-31EL-41-12
Operator Name: Keles Production Company Ltd.
License Number: 0110789
License Date: 1984-11-16
License Status: RecCertified
Spud Date: 1984-11-24
Final Drill Date: 1984-11-29
Well Total Depth: 940.00 m
Surface Hole Latitude: 52.570944
Surface Hole Longitude: -111.710236

For data sources see[1][2]

Well History

Date Event
1984-11-16 Obtained License
1984-11-24 Surface Casing Operation Performed
1984-11-26 Direction Drilling Operation Performed - Straighten Hole
1984-11-28 Well Log Performed
1984-11-29 Finished Drilling
1984-11-29 Well Mode changed to Drilled and Cased
1984-11-30 Production Casing Operation Performed
1984-11-30 Rig Released
1984-11-30 Well Log Performed
1984-12-07 Perforation Treatment Performed - Open-Hole Completion
1984-12-08 Perforation Treatment Performed - Cement Plug
1984-12-08 Well Log Performed
1984-12-10 Well Log Performed
1984-12-11 Perforation Treatment Performed - Jet Perforation
1984-12-11 Well Log Performed
1984-12-14 Perforation Treatment Performed - Jet Perforation
1984-12-14 Well Log Performed
1984-12-20 Well Began Production
1984-12-20 Well Fluid changed to Crude Oil
1984-12-20 Well Mode changed to Pumping
1988-07-05 Well Fluid changed to Crude Oil
1988-07-05 Well Mode changed to Suspended
1989-06-02 Perforation Treatment Performed - Abrasa-Jet Perforation
1989-06-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-06-02 Plug Back Performed
1989-06-02 Well Abandoned
1989-06-02 Well Fluid changed to Crude Oil
1989-06-02 Well Mode changed to Abandoned
1989-06-03 Perforation Treatment Performed - Remedial Casing
1994-09-30 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-11-26 438.00 Straighten Hole

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-12-07 Open Hole/Barefoot Completion 915.50 940.00 0
1984-12-08 Cement Plug 900.00 940.00 0
1984-12-11 Perforation 916.40 918.70 13
1984-12-14 Perforation 918.50 919.10 13
1984-12-14 Perforation 918.10 919.70 13
1984-12-14 Perforation 917.80 919.30 13
1989-06-02 Packing Device Capped w/Cement 899.00 907.00 0
1989-06-02 Hydra Jet Perforation 280.00 280.00 0
1989-06-03 Remedial Casing Cementing 280.00 280.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 288 0.0 0.0 0.0
1985 8471 0.0 0.0 0.0
1986 5570 0.0 0.0 0.0

For data sources see[6]

References