X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414123103000

Well Details

Well ID: 0414123103000
Loading map...
Location: 00/03-31-041-12W4/0
Location Alias: 00/03-31-41-12 W4M
Location Alias 2: 00/03-31-041-12 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 12
Section: 31
County/Municipality: Flagstaff County
Well Name: KELES ET AL BELL 3-31-41-12
Operator Name: Keles Production Company Ltd.
License Number: 0049908
License Date: 1974-05-28
License Status: RecCertified
Spud Date: 1974-06-22
Final Drill Date: 1974-06-26
Well Total Depth: 904.60 m
Surface Hole Latitude: 52.567361
Surface Hole Longitude: -111.721966

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-05-28 Obtained License
1974-06-25 Drill Stem Test Performed
1974-06-26 Finished Drilling
1974-06-26 Well Mode changed to Drilled and Cased
1974-06-27 Production Casing Operation Performed
1974-07-10 Perforation Treatment Performed - Open-Hole Completion
1974-09-02 Well Began Production
1974-09-02 Well Fluid changed to Crude Oil
1974-09-02 Well Mode changed to Flowing
1977-10-01 Well Fluid changed to Crude Oil
1977-10-01 Well Mode changed to Suspended
1980-05-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-05-22 Perforation Treatment Performed - Jet Perforation
1980-05-22 Well Fluid changed to Crude Oil
1980-05-22 Well Mode changed to Abandoned Zone
1988-11-05 Well Log Performed
1988-11-06 Perforation Treatment Performed - Jet Perforation
1990-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-24 Plug Back Performed
1990-09-24 Well Abandoned
1990-09-26 Well Log Performed
1990-10-25 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-07-10 Open Hole/Barefoot Completion 902.20 904.60 0
1980-05-21 Packing Device Capped w/Cement 876.40 884.00 0
1980-05-22 Perforation 754.10 756.20 13
1988-11-06 Perforation 754.20 756.20 7
1990-09-24 Packing Device Capped w/Cement 741.00 749.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1974 2354 0.0 0.0 0.0
1975 7584 0.0 0.0 0.0
1976 8615 0.0 0.0 0.0
1977 6096 0.0 0.0 0.0

For data sources see[5]

References