X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414123101020

Well Details

Well ID: 0414123101020
Loading map...
Location: 02/01-31-041-12W4/0
Location Alias: 02/01-31-41-12 W4M
Location Alias 2: 02/01-31-041-12 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 12
Section: 31
County/Municipality: Flagstaff County
Well Name: KELES ET AL BELL 1D-31-41-12
Operator Name: Keles Production Company Ltd.
License Number: 0110313
License Date: 1984-10-29
License Status: RecCertified
Spud Date: 1984-11-14
Final Drill Date: 1984-11-21
Well Total Depth: 940.00 m
Surface Hole Latitude: 52.568789
Surface Hole Longitude: -111.711049

For data sources see[1][2]

Well History

Date Event
1984-10-29 Obtained License
1984-11-15 Surface Casing Operation Performed
1984-11-16 Direction Drilling Operation Performed - Deviate
1984-11-21 Finished Drilling
1984-11-21 Lost Circulation Occurred
1984-11-21 Well Log Performed
1984-11-21 Well Mode changed to Drilled and Cased
1984-11-22 Production Casing Operation Performed
1984-11-22 Rig Released
1984-11-29 Perforation Treatment Performed - Cement Squeeze
1984-11-29 Perforation Treatment Performed - Open-Hole Completion
1984-11-29 Well Log Performed
1984-11-30 Perforation Treatment Performed - Open-Hole Completion
1984-12-01 Perforation Treatment Performed - Jet Perforation
1984-12-01 Well Log Performed
1984-12-18 Well Began Production
1984-12-18 Well Fluid changed to Crude Oil
1984-12-18 Well Mode changed to Pumping
1986-09-09 Perforation Treatment Performed - Jet Perforation
1986-09-09 Well Log Performed
1988-07-05 Well Fluid changed to Crude Oil
1988-07-05 Well Mode changed to Suspended
1990-09-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-09-24 Plug Back Performed
1990-09-26 Well Log Performed
1991-10-03 Well Log Performed
1991-10-04 Perforation Treatment Performed - Jet Perforation
1991-10-05 Perforation Treatment Performed - Remedial Casing
1991-10-05 Well Abandoned
1991-10-05 Well Fluid changed to Crude Oil
1991-10-05 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-11-16 310.40 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-11-29 Open Hole/Barefoot Completion 919.00 940.00 0
1984-11-29 Cement Squeeze 923.00 940.00 0
1984-11-30 Open Hole/Barefoot Completion 919.00 923.00 0
1984-12-01 Perforation 918.70 922.20 13
1986-09-09 Perforation 922.50 924.80 13
1990-09-24 Packing Device Capped w/Cement 905.00 913.00 0
1991-10-04 Perforation 255.00 255.30 13
1991-10-05 Remedial Casing Cementing 255.00 255.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 324 0.0 0.0 0.0
1985 8576 0.0 0.0 0.0
1986 8483 0.0 0.0 0.0
1987 8647 0.0 0.0 0.0
1988 3971 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1984-11-21 Lost Circulation 940.00 940.00

For data sources see[7]

References