X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414122905040

Well Details

Well ID: 0414122905040
Loading map...
Location: 04/05-29-041-12W4/0
Location Alias: 04/05-29-41-12 W4M
Location Alias 2: 04/05-29-041-12 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 12
Section: 29
County/Municipality: Flagstaff County
Well Name: SOC BELL 5-29-41-12
Operator Name: AlphaBow Energy Ltd.
License Number: 0157356
License Date: 1993-03-18
License Status: Suspension
Spud Date: 1993-03-20
Final Drill Date: 1993-03-23
Well Total Depth: 1056.00 m
Surface Hole Latitude: 52.557073
Surface Hole Longitude: -111.700585

For data sources see[1][2]

Well History

Date Event
1993-03-18 Obtained License
1993-03-21 Direction Drilling Operation Performed - Deviate
1993-03-21 Surface Casing Operation Performed
1993-03-23 Finished Drilling
1993-03-23 Well Mode changed to Drilled and Cased
1993-03-24 Well Log Performed
1993-03-25 Production Casing Operation Performed
1993-03-25 Rig Released
1993-03-25 Well Log Performed
1993-04-01 Well Log Performed
1993-04-02 Well Log Performed
1993-04-03 Perforation Treatment Performed - Jet Perforation
1993-04-04 Well Log Performed
1993-04-05 Perforation Treatment Performed - Fractured
1993-04-15 Well Began Production
1993-04-15 Well Fluid changed to Crude Oil
1993-04-15 Well Mode changed to Pumping
1998-10-30 Well Fluid changed to Crude Oil
1998-10-30 Well Mode changed to Suspended
2006-01-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-01-13 Plug Back Performed
2006-01-13 Well Fluid changed to Crude Oil
2006-01-13 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-03-21 226.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-04-03 Perforation 1001.50 1003.60 13
1993-04-03 Perforation 1004.00 1005.50 13
1993-04-05 Fracture 1001.50 1005.50 0
2006-01-13 Packing Device Capped w/Cement 986.60 994.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 6216 0.0 0.0 0.0
1994 7485 0.0 0.0 0.0
1995 8739 0.0 0.0 0.0
1996 8758 0.0 0.0 0.0
1997 8711 0.0 0.0 0.0
1998 1416 0.0 0.0 0.0

For data sources see[6]

References