X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414122803030

Well Details

Well ID: 0414122803030
Loading map...
Location: 03/03-28-041-12W4/0
Location Alias: 03/03-28-41-12 W4M
Location Alias 2: 03/03-28-041-12 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 12
Section: 28
County/Municipality: Flagstaff County
Well Name: VIKING UNIT A2 BELL 3-28-41-12
Operator Name: Harvest Operations Corp.
License Number: 0098690
License Date: 1982-11-10
License Status: Issued
Spud Date: 1982-12-18
Final Drill Date: 1982-12-21
Well Total Depth: 980.10 m
Surface Hole Latitude: 52.553469
Surface Hole Longitude: -111.671389

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-11-10 Obtained License
1982-12-18 Direction Drilling Operation Performed - 98
1982-12-21 Finished Drilling
1982-12-21 Well Log Performed
1982-12-21 Well Mode changed to Drilled and Cased
1982-12-22 Production Casing Operation Performed
1983-02-05 Perforation Treatment Performed - Jet Perforation
1983-04-14 Well Began Production
1983-04-14 Well Fluid changed to Crude Oil
1983-04-14 Well Mode changed to Pumping
1988-09-14 Perforation Treatment Performed - Jet Perforation
1988-09-16 Perforation Treatment Performed - Cement Squeeze
1988-09-20 Perforation Treatment Performed - Jet Perforation
1988-09-20 Well Log Performed
1990-04-01 Well Fluid changed to Crude Oil
1990-04-01 Well Mode changed to Suspended
1990-11-17 Perforation Treatment Performed - Cement Squeeze
1990-11-21 Well Log Performed
1990-11-24 Perforation Treatment Performed - Open-Hole Completion
1990-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-11-28 Perforation Treatment Performed - Jet Perforation
1990-11-28 Well Log Performed
1991-01-12 Well Began Injection
1991-01-12 Well Fluid changed to Water
1991-01-12 Well Type changed to Injection
2012-04-01 Well Fluid changed to Water
2012-04-01 Well Type changed to Disposal

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1982-12-18 253.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-02-05 Perforation 921.50 922.50 13
1990-11-28 Perforation 948.00 958.00 13
1983-02-05 Perforation 924.50 926.00 13
1988-09-14 Perforation 921.50 923.00 12
1988-09-16 Cement Squeeze 921.50 926.00 0
1988-09-20 Perforation 925.00 928.00 13
1990-11-17 Cement Squeeze 925.00 928.00 0
1990-11-24 Open Hole/Barefoot Completion 958.00 980.10 0
1990-11-26 Acid Treatment 958.00 980.10 0
1990-11-28 Perforation 935.00 945.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 4884 0.0 0.0 0.0
1984 8530 0.0 0.0 0.0
1985 8489 0.0 0.0 0.0
1986 8702 0.0 0.0 0.0
1987 8697 0.0 0.0 0.0
1988 8487 0.0 0.0 0.0
1989 8715 0.0 0.0 0.0
1990 1796 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

References