X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414110103A00

Well Details

Well ID: 0414110103A00
Loading map...
Location: A0/03-01-041-11W4/0
Location Alias: A0/03-01-41-11 W4M
Location Alias 2: A0/03-01-041-11 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 11
Section: 01
County/Municipality: Flagstaff County
Well Name: COYOTE PROVO 3-1-41-11
Operator Name: Harvest Operations Corp.
License Number: 0153759
License Date: 1992-09-18
License Status: Abandoned
Spud Date: 1992-10-22
Final Drill Date: 1992-10-25
Well Total Depth: 1058.00 m
Surface Hole Latitude: 52.492914
Surface Hole Longitude: -111.462988

For data sources see[1][2]

Well History

Date Event
1992-09-18 Obtained License
1992-10-23 Direction Drilling Operation Performed - Deviate
1992-10-23 Surface Casing Operation Performed
1992-10-25 Finished Drilling
1992-10-25 Well Log Performed
1992-10-25 Well Mode changed to Drilled and Cased
1992-10-26 Production Casing Operation Performed
1992-10-26 Rig Released
1992-11-18 Perforation Treatment Performed - Jet Perforation
1992-11-18 Well Log Performed
1992-11-30 Well Log Performed
1992-12-23 Well Began Production
1992-12-23 Well Fluid changed to Crude Oil
1992-12-23 Well Mode changed to Pumping
1997-11-04 Perforation Treatment Performed - Cement Squeeze
1997-11-07 Perforation Treatment Performed - Jet Perforation
1997-11-07 Well Log Performed
2015-09-01 Well Fluid changed to Crude Oil
2015-09-01 Well Mode changed to Suspended
2015-12-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-12-28 Plug Back Performed
2015-12-28 Well Fluid changed to Crude Oil
2015-12-28 Well Mode changed to Abandoned Zone
2016-01-30 Well Abandoned
2016-01-30 Well Fluid changed to Crude Oil
2016-01-30 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-10-23 209.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-11-18 Perforation 979.00 983.00 13
1997-11-04 Cement Squeeze 979.00 983.00 0
1997-11-07 Perforation 979.00 982.00 17
2015-12-28 Packing Device Capped w/Cement 963.00 971.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 205 0.0 0.0 0.0
1993 8404 0.0 0.0 0.0
1994 7804 0.0 0.0 0.0
1995 7899 0.0 0.0 0.0
1996 8495 0.0 0.0 0.0
1997 7585 0.0 0.0 0.0
1998 8668 0.0 0.0 0.0
1999 8605 0.0 0.0 0.0
2000 8647 0.0 0.0 0.0
2001 8462 0.0 0.0 0.0
2002 8581 0.0 0.0 0.0
2003 8175 0.0 0.0 0.0
2004 8609 0.0 0.0 0.0
2005 8628 0.0 0.0 0.0
2006 8358 0.0 0.0 0.0
2007 8557 0.0 0.0 0.0
2008 8189 0.0 0.0 0.0
2009 8312 0.0 0.0 0.0
2010 8271 0.0 0.0 0.0
2011 8599 0.0 0.0 0.0
2012 8543 0.0 0.0 0.0
2013 7551 0.0 0.0 0.0
2014 5251 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-12-28 No Incident Encountered 0.00 0.00

For data sources see[7]

References