If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0414092507005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.554913,"lon":-111.164144,"icon":""}]} |
| Location: 00/07-25-041-09W4/5 | |
| Location Alias: 00/07-25-41-09 W4M | |
| Location Alias 2: 00/07-25-041-09 W4/05 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 041 | |
| Meridian: 4 | |
| Range: 09 | |
| Section: 25 | |
| County/Municipality: Municipal District of Provost No. 52 | |
| Well Name: CLEO ENERGY PROVOST 7-25-41-9 | |
| Operator Name: Cleo Energy Corp. | |
| License Number: 0083149 | |
| License Date: 1980-05-30 | |
| License Status: Abandoned | |
| Spud Date: 1980-06-09 | |
| Final Drill Date: 1980-06-13 | |
| Well Total Depth: 905.00 m | |
| Surface Hole Latitude: 52.554913 | |
| Surface Hole Longitude: -111.164144 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1980-05-30 | Obtained License |
| 1980-06-09 | Lost Circulation Occurred |
| 1980-06-12 | Drill Stem Test Performed |
| 1980-06-13 | Finished Drilling |
| 1980-06-13 | Well Mode changed to Drilled and Cased |
| 1980-06-14 | Drill Stem Test Performed |
| 1980-06-14 | Well Log Performed |
| 1980-06-15 | Drill Stem Test Performed |
| 1980-06-16 | Production Casing Operation Performed |
| 1981-06-06 | Perforation Treatment Performed - Jet Perforation |
| 1993-12-09 | Perforation Treatment Performed - Jet Perforation |
| 2001-08-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2001-08-12 | Plug Back Performed |
| 2001-08-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2001-08-13 | Perforation Treatment Performed - Jet Perforation |
| 2001-08-13 | Plug Back Performed |
| 2001-08-13 | Well Log Performed |
| 2007-08-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-08-19 | Perforation Treatment Performed - Jet Perforation |
| 2007-08-19 | Plug Back Performed |
| 2007-08-19 | Well Log Performed |
| 2007-08-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2007-08-22 | Perforation Treatment Performed - Jet Perforation |
| 2007-08-22 | Plug Back Performed |
| 2007-08-22 | Well Log Performed |
| 2008-06-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2008-06-04 | Plug Back Performed |
| 2008-06-04 | Well Log Performed |
| 2008-06-04 | Well Mode changed to Abandoned Zone |
| 2008-06-05 | Perforation Treatment Performed - Jet Perforation |
| 2008-06-05 | Well Log Performed |
| 2008-06-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2008-06-16 | Perforation Treatment Performed - Remedial Casing |
| 2008-06-17 | Well Abandoned |
| 2008-06-17 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1981-06-06 | Perforation | 874.00 | 875.00 | 12 |
| 2007-08-22 | Perforation | 597.00 | 600.00 | 20 |
| 2007-08-22 | Perforation | 601.00 | 606.00 | 20 |
| 2008-06-04 | Packing Device Capped w/Cement | 579.00 | 589.00 | 0 |
| 2008-06-05 | Perforation | 484.00 | 485.00 | 17 |
| 2008-06-16 | Remedial Casing Cementing | 484.00 | 485.00 | 0 |
| 2008-06-16 | Packing Device Capped w/Cement | 448.00 | 479.00 | 0 |
| 1993-12-09 | Perforation | 796.50 | 797.50 | 13 |
| 2001-08-12 | Packing Device Capped w/Cement | 858.00 | 866.00 | 0 |
| 2001-08-13 | Packing Device Capped w/Cement | 784.00 | 792.00 | 0 |
| 2001-08-13 | Perforation | 745.50 | 748.00 | 17 |
| 2001-08-13 | Perforation | 749.00 | 750.00 | 17 |
| 2007-08-19 | Packing Device Capped w/Cement | 723.00 | 731.00 | 0 |
| 2007-08-19 | Perforation | 648.50 | 654.00 | 20 |
| 2007-08-22 | Packing Device Capped w/Cement | 629.00 | 637.00 | 0 |
For data sources see[4]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 1980-06-09 | Lost Circulation | 110.00 | 195.00 |
For data sources see[5]