X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414042205040

Well Details

Well ID: 0414042205040
Loading map...
Location: 04/05-22-041-04W4/0
Location Alias: 04/05-22-41-04 W4M
Location Alias 2: 04/05-22-041-04 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 04
Section: 22
County/Municipality: Municipal District of Wainwright No. 61
Well Name: BOW RIVER DOLCY 5-22-41-4
Operator Name: Bow River Energy Ltd.
License Number: 0201884
License Date: 1997-05-29
License Status: Abandoned
Spud Date: 1997-07-03
Final Drill Date: 1997-07-05
Well Total Depth: 850.00 m
Surface Hole Latitude: 52.542130
Surface Hole Longitude: -110.505384

For data sources see[1][2]

Well History

Date Event
1997-05-29 Obtained License
1997-07-04 Surface Casing Operation Performed
1997-07-05 Finished Drilling
1997-07-05 Well Log Performed
1997-07-05 Well Mode changed to Drilled and Cased
1997-07-06 Production Casing Operation Performed
1997-07-06 Rig Released
1997-07-11 Perforation Treatment Performed - Jet Perforation
1997-07-16 Well Began Production
1997-07-16 Well Fluid changed to Crude Oil
1997-07-16 Well Mode changed to Pumping
1999-07-26 Well Fluid changed to Crude Oil
1999-07-26 Well Mode changed to Suspended
2002-03-24 Well Fluid changed to Crude Oil
2002-03-24 Well Mode changed to Pumping
2009-02-04 Well Fluid changed to Crude Oil
2009-02-04 Well Mode changed to Suspended
2011-01-22 Perforation Treatment Performed - Jet Perforation
2011-01-22 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2011-01-22 Plug Back Performed
2011-01-22 Well Fluid changed to Crude Oil
2011-01-22 Well Log Performed
2011-01-22 Well Mode changed to Abandoned Zone
2015-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-09-30 Plug Back Performed
2015-11-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-07-11 Perforation 818.50 821.50 13
2011-01-22 Packing Dev Cpd w/Res-Gyp Cem 815.00 818.00 0
2011-01-22 Perforation 808.50 809.50 17
2015-09-30 Packing Device Capped w/Cement 792.00 800.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 4001 0.0 0.0 0.0
1998 7954 0.0 0.0 0.0
1999 1695 0.0 0.0 0.0
2002 5996 0.0 0.0 0.0
2003 8693 0.0 0.0 0.0
2004 7878 0.0 0.0 0.0
2005 378 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-09-30 No Incident Encountered 0.00 0.00

For data sources see[6]

References