X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414041511002

Well Details

Well ID: 0414041511002
Loading map...
Location: 00/11-15-041-04W4/2
Location Alias: 00/11-15-41-04 W4M
Location Alias 2: 00/11-15-041-04 W4/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 04
Section: 15
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER DOLCY 11-15-41-4
Operator Name: Bow River Energy Ltd.
License Number: 0233466
License Date: 2000-02-10
License Status: Suspension
Spud Date: 2000-03-11
Final Drill Date: 2000-03-14
Well Total Depth: 840.00 m
Surface Hole Latitude: 52.532180
Surface Hole Longitude: -110.498997

For data sources see[1][2]

Well History

Date Event
2000-02-10 Obtained License
2000-03-12 Direction Drilling Operation Performed - Deviate
2000-03-12 Surface Casing Operation Performed
2000-03-14 Finished Drilling
2000-03-14 Well Log Performed
2000-03-14 Well Mode changed to Drilled and Cased
2000-03-15 Production Casing Operation Performed
2000-03-15 Rig Released
2000-03-17 Perforation Treatment Performed - Jet Perforation
2006-07-20 Well Log Performed
2006-07-21 Perforation Treatment Performed - Jet Perforation
2006-07-21 Well Log Performed
2007-06-19 Well Began Production
2007-06-19 Well Fluid changed to Gas
2007-06-19 Well Mode changed to Flowing
2011-11-08 Well Fluid changed to Gas
2011-11-08 Well Mode changed to Suspended
2014-01-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-01-20 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2014-01-20 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-03-12 158.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-03-17 Perforation 808.00 809.00 13
2006-07-21 Perforation 795.00 796.50 17
2014-01-20 Packing Dev Cpd w/Res-Gyp Cem 801.50 804.50 0
2014-01-20 Packing Device Capped w/Cement 782.00 790.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 4704 0.0 0.0 0.0
2008 8474 0.0 0.0 0.0
2009 8721 0.0 0.0 0.0
2010 7037 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-20 No Incident Encountered 0.00 0.00

For data sources see[7]

References