X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414031805050

Well Details

Well ID: 0414031805050
Loading map...
Location: 05/05-18-041-03W4/0
Location Alias: 05/05-18-41-03 W4M
Location Alias 2: 05/05-18-041-03 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 03
Section: 18
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 5-18-41-3
Operator Name: Bow River Energy Ltd.
License Number: 0198755
License Date: 1997-02-27
License Status: Suspension
Spud Date: 1997-03-04
Final Drill Date: 1997-03-07
Well Total Depth: 894.00 m
Surface Hole Latitude: 52.528289
Surface Hole Longitude: -110.431608

For data sources see[1][2]

Well History

Date Event
1997-02-27 Obtained License
1997-03-05 Surface Casing Operation Performed
1997-03-06 Direction Drilling Operation Performed - Deviate
1997-03-07 Finished Drilling
1997-03-07 Well Log Performed
1997-03-07 Well Mode changed to Drilled and Cased
1997-03-08 Production Casing Operation Performed
1997-03-08 Rig Released
1997-03-15 Perforation Treatment Performed - Jet Perforation
1997-03-15 Well Log Performed
1997-03-20 Well Log Performed
1997-04-01 Well Began Production
1997-04-01 Well Fluid changed to Crude Oil
1997-04-01 Well Mode changed to Pumping
1998-04-20 Perforation Treatment Performed - Jet Perforation
1998-04-20 Well Log Performed
1998-04-22 Well Log Performed
1999-07-27 Well Fluid changed to Crude Oil
1999-07-27 Well Mode changed to Suspended
2002-09-01 Well Fluid changed to Crude Oil
2002-09-01 Well Mode changed to Pumping
2011-08-31 Well Fluid changed to Crude Oil
2011-08-31 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-03-06 390.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-03-15 Perforation 806.00 807.70 14
1998-04-20 Perforation 799.00 801.00 14

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 4484 0.0 0.0 0.0
1998 4618 0.0 0.0 0.0
2002 2924 0.0 0.0 0.0
2003 8069 0.0 0.0 0.0
2004 8659 0.0 0.0 0.0
2005 7866 0.0 0.0 0.0
2006 8476 0.0 0.0 0.0
2007 7370 0.0 0.0 0.0
2008 8735 0.0 0.0 0.0
2009 5220 0.0 0.0 0.0
2010 6011 0.0 0.0 0.0

For data sources see[6]

References