X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414030307030

Well Details

Well ID: 0414030307030
Loading map...
Location: 03/07-03-041-03W4/0
Location Alias: 03/07-03-41-03 W4M
Location Alias 2: 03/07-03-041-03 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 03
Section: 03
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 7-3-41-3
Operator Name: Bow River Energy Ltd.
License Number: 0206987
License Date: 1997-10-07
License Status: Suspension
Spud Date: 1997-10-29
Final Drill Date: 1997-10-31
Well Total Depth: 854.00 m
Surface Hole Latitude: 52.498913
Surface Hole Longitude: -110.349787

For data sources see[1][2]

Well History

Date Event
1997-10-07 Obtained License
1997-10-30 Direction Drilling Operation Performed - Deviate
1997-10-30 Surface Casing Operation Performed
1997-10-31 Finished Drilling
1997-10-31 Well Log Performed
1997-10-31 Well Mode changed to Drilled and Cased
1997-11-01 Production Casing Operation Performed
1997-11-01 Rig Released
1997-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-11-10 Perforation Treatment Performed - Jet Perforation
1997-11-10 Plug Back Performed
1997-11-27 Well Began Production
1997-11-27 Well Fluid changed to Crude Oil
1997-11-27 Well Mode changed to Pumping
1997-12-15 Well Log Performed
2003-05-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-05-21 Perforation Treatment Performed - Jet Perforation
2003-05-21 Plug Back Performed
2003-05-21 Well Fluid changed to Crude Oil
2003-05-21 Well Log Performed
2003-05-21 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-10-30 213.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-11-10 Perforation 818.50 820.50 13
1997-11-10 Perforation 827.50 829.00 13
1997-11-10 Packing Device Capped w/Cement 824.00 827.00 0
2003-05-21 Packing Device Capped w/Cement 814.00 817.00 0
2003-05-21 Perforation 808.00 810.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 821 0.0 0.0 0.0
1998 8558 0.0 0.0 0.0
1999 8366 0.0 0.0 0.0
2000 8743 0.0 0.0 0.0
2001 8716 0.0 0.0 0.0
2002 528 0.0 0.0 0.0

For data sources see[6]

References