X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414030206003

Well Details

Well ID: 0414030206003
Loading map...
Location: 00/06-02-041-03W4/3
Location Alias: 00/06-02-41-03 W4M
Location Alias 2: 00/06-02-041-03 W4/03
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 03
Section: 02
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 6-2-41-3
Operator Name: Bow River Energy Ltd.
License Number: 0090589
License Date: 1981-06-09
License Status: Issued
Spud Date: 1981-06-15
Final Drill Date: 1981-06-18
Well Total Depth: 823.00 m
Surface Hole Latitude: 52.497774
Surface Hole Longitude: -110.331850

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-06-09 Obtained License
1981-06-16 Surface Casing Operation Performed
1981-06-18 Finished Drilling
1981-06-18 Well Mode changed to Drilled and Cased
1981-06-20 Production Casing Operation Performed
1981-07-16 Perforation Treatment Performed - Jet Perforation
1985-10-10 Perforation Treatment Performed - Cement Squeeze
1985-10-16 Perforation Treatment Performed - Open-Hole Completion
1985-10-17 Liner Casing Operation Performed
1985-10-17 Perforation Treatment Performed - Cement Squeeze
1985-10-29 Well Log Performed
1986-01-31 Perforation Treatment Performed - Jet Perforation
1986-01-31 Well Log Performed
1986-02-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-03-16 Perforation Treatment Performed - Jet Perforation
1994-03-16 Plug Back Performed
1994-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-18 Well Began Injection
1994-03-18 Well Fluid changed to Water
1994-03-18 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-07-16 Perforation 746.50 747.00 13
1985-10-10 Cement Squeeze 746.50 747.00 0
1985-10-16 Open Hole/Barefoot Completion 764.50 823.00 0
1985-10-17 Cement Squeeze 764.50 823.00 0
1986-01-31 Perforation 781.00 791.00 13
1986-02-06 Acid Treatment 781.00 791.00 0
1994-03-16 Packing Device Capped w/Cement 774.00 776.00 0
1994-03-16 Perforation 749.00 751.00 20
1994-03-17 Acid Treatment 749.00 751.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References