X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414030203020

Well Details

Well ID: 0414030203020
Loading map...
Location: 02/03-02-041-03W4/0
Location Alias: 02/03-02-41-03 W4M
Location Alias 2: 02/03-02-041-03 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 03
Section: 02
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 3-2-41-3
Operator Name: Bow River Energy Ltd.
License Number: 0159216
License Date: 1993-06-17
License Status: Abandoned
Spud Date: 1993-06-17
Final Drill Date: 1993-06-19
Well Total Depth: 808.00 m
Surface Hole Latitude: 52.494060
Surface Hole Longitude: -110.332855

For data sources see[1][2]

Well History

Date Event
1993-06-17 Obtained License
1993-06-18 Surface Casing Operation Performed
1993-06-19 Finished Drilling
1993-06-19 Well Log Performed
1993-06-19 Well Mode changed to Drilled and Cased
1993-06-20 Production Casing Operation Performed
1993-06-20 Rig Released
1993-07-14 Perforation Treatment Performed - Jet Perforation
1993-08-01 Well Began Production
1993-08-01 Well Fluid changed to Crude Oil
1993-08-01 Well Mode changed to Pumping
1993-11-01 Perforation Treatment Performed - Jet Perforation
1993-11-02 Perforation Treatment Performed - Cement Squeeze
1993-11-05 Perforation Treatment Performed - Jet Perforation
1999-10-28 Well Fluid changed to Crude Oil
1999-10-28 Well Mode changed to Suspended
2003-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-08-23 Plug Back Performed
2003-08-23 Well Fluid changed to Crude Oil
2003-08-23 Well Mode changed to Abandoned Zone
2007-11-19 Well Abandoned
2007-11-19 Well Fluid changed to Crude Oil
2007-11-19 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-07-14 Perforation 754.00 755.50 13
1993-11-01 Perforation 757.00 758.00 13
1993-11-02 Cement Squeeze 754.00 758.00 0
1993-11-05 Perforation 754.00 755.50 13
2003-08-23 Packing Device Capped w/Cement 741.00 749.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 3463 0.0 0.0 0.0
1994 8447 0.0 0.0 0.0
1995 8665 0.0 0.0 0.0
1996 8690 0.0 0.0 0.0
1997 8333 0.0 0.0 0.0
1998 8343 0.0 0.0 0.0
1999 6193 0.0 0.0 0.0

For data sources see[5]

References