X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414012912000

Well Details

Well ID: 0414012912000
Loading map...
Location: 00/12-29-041-01W4/0
Location Alias: 00/12-29-41-01 W4M
Location Alias 2: 00/12-29-041-01 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 01
Section: 29
County/Municipality: Municipal District of Wainwright No. 61
Well Name: HARVEST ET AL 12A HAYTER 12-29-41-1
Operator Name: Harvest Operations Corp.
License Number: 0092228
License Date: 1981-09-16
License Status: Suspension
Spud Date: 1981-09-16
Final Drill Date: 1981-09-19
Well Total Depth: 803.00 m
Surface Hole Latitude: 52.558905
Surface Hole Longitude: -110.120720

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-09-16 Obtained License
1981-09-19 Finished Drilling
1981-09-19 Well Log Performed
1981-09-19 Well Mode changed to Drilled and Cased
1981-09-20 Production Casing Operation Performed
1981-09-25 Perforation Treatment Performed - Jet Perforation
1981-09-26 Well Began Production
1981-09-26 Well Fluid changed to Crude Oil
1981-09-26 Well Mode changed to Pumping
1983-07-28 Perforation Treatment Performed - Cement Squeeze
1983-07-30 Perforation Treatment Performed - Jet Perforation
1992-10-08 Perforation Treatment Performed - Cement Squeeze
1992-10-09 Well Log Performed
1992-10-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-10-10 Perforation Treatment Performed - Jet Perforation
1992-11-02 Well Began Injection
1992-11-02 Well Fluid changed to Water
1992-11-02 Well Type changed to Injection
2015-12-01 Well Fluid changed to Water
2015-12-01 Well Mode changed to Suspended
2015-12-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-09-25 Perforation 723.00 724.30 13
1983-07-28 Cement Squeeze 723.00 724.30 0
1983-07-30 Perforation 718.00 725.00 15
1992-10-08 Cement Squeeze 718.00 725.00 0
1992-10-10 Perforation 733.00 741.50 13
1992-10-10 Acid Treatment 733.00 741.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 288 0.0 0.0 0.0
1982 168 0.0 0.0 0.0
1983 2823 0.0 0.0 0.0
1984 8287 0.0 0.0 0.0
1985 8432 0.0 0.0 0.0
1986 8693 0.0 0.0 0.0
1987 8757 0.0 0.0 0.0
1988 8774 0.0 0.0 0.0
1989 8600 0.0 0.0 0.0
1990 1488 0.0 0.0 0.0
1991 8386 0.0 0.0 0.0
1992 6729 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References