X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414012906D40

Well Details

Well ID: 0414012906D40
Loading map...
Location: D4/06-29-041-01W4/0
Location Alias: D4/06-29-41-01 W4M
Location Alias 2: D4/06-29-041-01 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 01
Section: 29
County/Municipality: Municipal District of Wainwright No. 61
Well Name: HARVEST 6C3 HAYTER 6-29-41-1
Operator Name: Harvest Operations Corp.
License Number: 0155109
License Date: 1992-12-11
License Status: Suspension
Spud Date: 1993-01-30
Final Drill Date: 1993-02-01
Well Total Depth: 806.00 m
Surface Hole Latitude: 52.557227
Surface Hole Longitude: -110.118514

For data sources see[1][2]

Well History

Date Event
1992-12-11 Obtained License
1993-01-31 Direction Drilling Operation Performed - Deviate
1993-01-31 Surface Casing Operation Performed
1993-02-01 Finished Drilling
1993-02-01 Well Log Performed
1993-02-01 Well Mode changed to Drilled and Cased
1993-02-02 Production Casing Operation Performed
1993-02-02 Rig Released
1993-02-07 Perforation Treatment Performed - Jet Perforation
1993-02-08 Well Began Production
1993-02-08 Well Fluid changed to Crude Oil
1993-02-08 Well Mode changed to Pumping
1993-02-09 Well Log Performed
1999-06-08 Well Fluid changed to Crude Oil
1999-06-08 Well Mode changed to Suspended
2000-10-01 Well Fluid changed to Crude Oil
2000-10-01 Well Mode changed to Pumping
2001-07-11 Well Fluid changed to Crude Oil
2001-07-11 Well Mode changed to Suspended
2010-04-22 Well Log Performed
2011-03-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-03-10 Plug Back Performed
2011-03-10 Well Fluid changed to Crude Oil
2011-03-10 Well Log Performed
2011-03-10 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-01-31 231.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-02-07 Perforation 761.00 768.00 13
2011-03-10 Packing Device Capped w/Cement 741.00 751.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 7732 0.0 0.0 0.0
1994 8646 0.0 0.0 0.0
1995 8687 0.0 0.0 0.0
1996 8607 0.0 0.0 0.0
1997 8693 0.0 0.0 0.0
1998 5054 0.0 0.0 0.0
2000 383 0.0 0.0 0.0

For data sources see[6]

References