X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414012903000

Well Details

Well ID: 0414012903000
Loading map...
Location: 00/03-29-041-01W4/0
Location Alias: 00/03-29-41-01 W4M
Location Alias 2: 00/03-29-041-01 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 01
Section: 29
County/Municipality: Municipal District of Wainwright No. 61
Well Name: HARVEST ET AL 3A HAYTER 3-29-41-1
Operator Name: Harvest Operations Corp.
License Number: 0091239
License Date: 1981-07-15
License Status: Suspension
Spud Date: 1981-07-26
Final Drill Date: 1981-07-29
Well Total Depth: 854.00 m
Surface Hole Latitude: 52.551666
Surface Hole Longitude: -110.114725

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-07-15 Obtained License
1981-07-29 Finished Drilling
1981-07-29 Well Log Performed
1981-07-29 Well Mode changed to Drilled and Cased
1981-07-30 Drill Stem Test Performed
1981-07-31 Production Casing Operation Performed
1981-08-07 Perforation Treatment Performed - Jet Perforation
1981-08-10 Well Began Production
1981-08-10 Well Fluid changed to Crude Oil
1981-08-10 Well Mode changed to Pumping
1981-09-05 Perforation Treatment Performed - Jet Perforation
1997-12-01 Well Fluid changed to Crude Oil
1997-12-01 Well Mode changed to Suspended
2008-07-30 Well Log Performed
2008-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-31 Plug Back Performed
2008-07-31 Well Fluid changed to Crude Oil
2008-07-31 Well Mode changed to Abandoned Zone
2010-06-18 Perforation Treatment Performed - Jet Perforation
2010-06-19 Perforation Treatment Performed - Jet Perforation
2010-06-20 Well Log Performed
2010-09-27 Well Fluid changed to Crude Oil
2010-09-27 Well Mode changed to Pumping
2016-09-27 Well Fluid changed to Crude Oil
2016-09-27 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-08-07 Perforation 761.00 764.00 13
1981-09-05 Perforation 766.00 767.00 13
2008-07-31 Packing Device Capped w/Cement 747.00 755.00 0
2010-06-18 Perforation 761.00 764.00 1
2010-06-19 Perforation 760.60 763.00 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 3156 0.0 0.0 0.0
1982 3767 0.0 0.0 0.0
1983 6784 0.0 0.0 0.0
1984 8628 0.0 0.0 0.0
1985 8707 0.0 0.0 0.0
1986 8729 0.0 0.0 0.0
1987 8757 0.0 0.0 0.0
1988 8774 0.0 0.0 0.0
1989 8657 0.0 0.0 0.0
1990 7012 0.0 0.0 0.0
1991 8624 0.0 0.0 0.0
1992 8750 0.0 0.0 0.0
1993 8611 0.0 0.0 0.0
1994 8550 0.0 0.0 0.0
1995 8687 0.0 0.0 0.0
1996 8295 0.0 0.0 0.0
1997 6974 0.0 0.0 0.0
2010 2318 0.0 0.0 0.0
2011 8691 0.0 0.0 0.0
2012 8749 0.0 0.0 0.0
2013 8573 0.0 0.0 0.0
2014 8722 0.0 0.0 0.0
2015 5051 0.0 0.0 0.0

For data sources see[5]

References