X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414012812002

Well Details

Well ID: 0414012812002
Loading map...
Location: 00/12-28-041-01W4/2
Location Alias: 00/12-28-41-01 W4M
Location Alias 2: 00/12-28-041-01 W4/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 01
Section: 28
County/Municipality: Municipal District of Wainwright No. 61
Well Name: HARVEST ET AL 12B HAYTER 12-28-41-1
Operator Name: Harvest Operations Corp.
License Number: 0092032
License Date: 1981-09-01
License Status: Suspension
Spud Date: 1981-09-13
Final Drill Date: 1981-09-17
Well Total Depth: 840.00 m
Surface Hole Latitude: 52.558837
Surface Hole Longitude: -110.098838

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-09-01 Obtained License
1981-09-17 Finished Drilling
1981-09-17 Well Log Performed
1981-09-18 Production Casing Operation Performed
1981-09-26 Perforation Treatment Performed - Jet Perforation
1981-10-16 Perforation Treatment Performed - Jet Perforation
1981-11-11 Perforation Treatment Performed - Jet Perforation
1990-11-08 Well Log Performed
1990-11-13 Perforation Treatment Performed - Cement Squeeze
1990-11-13 Plug Back Performed
1990-11-14 Well Log Performed
1990-11-15 Perforation Treatment Performed - Jet Perforation
1990-11-15 Well Mode changed to Drilled and Cased
1990-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-01-10 Well Began Injection
1991-01-10 Well Fluid changed to Water
1991-01-10 Well Type changed to Injection
2018-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-03-20 Plug Back Performed
2018-03-20 Well Fluid changed to Water
2018-03-20 Well Mode changed to Abandoned Zone
2018-03-20 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-09-26 Perforation 723.00 724.30 13
1981-10-16 Perforation 725.00 727.00 13
1981-11-11 Perforation 727.00 728.50 13
1990-11-13 Cement Squeeze 723.00 728.50 0
1990-11-15 Perforation 786.00 815.00 13
1990-12-22 Acid Treatment 786.00 815.00 0
2018-03-20 Packing Device Capped w/Cement 615.00 774.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-03-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References