X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414012205000

Well Details

Well ID: 0414012205000
Loading map...
Location: 00/05-22-041-01W4/0
Location Alias: 00/05-22-41-01 W4M
Location Alias 2: 00/05-22-041-01 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 01
Section: 22
County/Municipality: Municipal District of Wainwright No. 61
Well Name: WLEC HAYTER 5-22-41-1
Operator Name: West Lake Energy Corp.
License Number: 0110915
License Date: 1984-11-23
License Status: RecCertified
Spud Date: 1984-12-03
Final Drill Date: 1984-12-07
Well Total Depth: 820.00 m
Surface Hole Latitude: 52.540873
Surface Hole Longitude: -110.073752

For data sources see[1][2]

Well History

Date Event
1984-11-23 Obtained License
1984-12-04 Surface Casing Operation Performed
1984-12-07 Finished Drilling
1984-12-07 Well Log Performed
1984-12-07 Well Mode changed to Drilled and Cased
1984-12-09 Production Casing Operation Performed
1984-12-09 Rig Released
1984-12-12 Perforation Treatment Performed - Jet Perforation
1984-12-12 Well Log Performed
1984-12-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-12-13 Plug Back Performed
1984-12-13 Well Log Performed
1985-01-10 Perforation Treatment Performed - Jet Perforation
1985-01-11 Perforation Treatment Performed - Fractured
1985-01-28 Well Began Production
1985-01-28 Well Fluid changed to Crude Oil
1985-01-28 Well Mode changed to Pumping
2000-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-29 Perforation Treatment Performed - Jet Perforation
2000-07-29 Plug Back Performed
2000-07-29 Well Fluid changed to Crude Oil
2000-07-29 Well Mode changed to Abandoned Zone
2000-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-08-24 Plug Back Performed
2000-10-14 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-12-12 Perforation 805.60 806.30 13
2000-07-29 Perforation 660.50 663.50 13
2000-08-24 Packing Device Capped w/Cement 642.00 650.00 0
1984-12-12 Perforation 807.30 808.00 13
1984-12-12 Perforation 808.90 809.00 13
1984-12-12 Perforation 810.50 812.00 13
1984-12-13 Packing Device Capped w/Cement 792.00 800.00 0
1985-01-10 Perforation 757.00 758.00 13
1985-01-10 Perforation 761.40 763.00 13
1985-01-11 Fracture 757.00 763.00 0
2000-07-29 Packing Device Capped w/Cement 737.00 745.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 7473 0.0 0.0 0.0
1986 7922 0.0 0.0 0.0
1987 8303 0.0 0.0 0.0
1988 8707 0.0 0.0 0.0
1989 8396 0.0 0.0 0.0
1990 8245 0.0 0.0 0.0
1991 8461 0.0 0.0 0.0
1992 8673 0.0 0.0 0.0
1993 8711 0.0 0.0 0.0
1994 7217 0.0 0.0 0.0
1995 7832 0.0 0.0 0.0
1996 6958 0.0 0.0 0.0
1997 3636 0.0 0.0 0.0

For data sources see[5]

References