X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414012015A20

Well Details

Well ID: 0414012015A20
Loading map...
Location: A2/15-20-041-01W4/0
Location Alias: A2/15-20-41-01 W4M
Location Alias 2: A2/15-20-041-01 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 01
Section: 20
County/Municipality: Municipal District of Wainwright No. 61
Well Name: HARVEST 15A DI HAYTER 15-20-41-1
Operator Name: Harvest Operations Corp.
License Number: 0154265
License Date: 1992-10-28
License Status: Issued
Spud Date: 1992-11-05
Final Drill Date: 1992-11-08
Well Total Depth: 877.00 m
Surface Hole Latitude: 52.546897
Surface Hole Longitude: -110.107635

For data sources see[1][2]

Well History

Date Event
1992-10-28 Obtained License
1992-11-06 Surface Casing Operation Performed
1992-11-07 Direction Drilling Operation Performed - Deviate
1992-11-08 Finished Drilling
1992-11-08 Well Log Performed
1992-11-08 Well Mode changed to Drilled and Cased
1992-11-09 Production Casing Operation Performed
1992-11-09 Rig Released
1992-11-11 Perforation Treatment Performed - Jet Perforation
1992-11-16 Well Began Production
1992-11-16 Well Fluid changed to Crude Oil
1992-11-16 Well Mode changed to Pumping
1992-11-20 Well Log Performed
1994-03-06 Perforation Treatment Performed - Cement Squeeze
1994-03-09 Perforation Treatment Performed - Jet Perforation
1994-04-30 Well Fluid changed to Crude Oil
1994-04-30 Well Mode changed to Suspended
1995-01-01 Well Began Injection
1995-01-01 Well Fluid changed to Water
1995-01-01 Well Type changed to Disposal
1995-01-02 Well Fluid changed to Water
1995-01-02 Well Type changed to Injection
2011-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-11-07 273.30 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-11-11 Perforation 840.00 841.00 13
1994-03-06 Cement Squeeze 840.00 841.00 0
1994-03-09 Perforation 850.50 860.00 17
2011-01-24 Acid Treatment 850.50 860.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 1064 0.0 0.0 0.0
1993 8515 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0

For data sources see[6]

References