If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414012011C00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.545968,"lon":-110.120439,"icon":""}]} |
Location: C0/11-20-041-01W4/0 | |
Location Alias: C0/11-20-41-01 W4M | |
Location Alias 2: C0/11-20-041-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 01 | |
Section: 20 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: HARVEST 11C2 HAYTER 11-20-41-1 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0154842 | |
License Date: 1992-12-01 | |
License Status: Abandoned | |
Spud Date: 1992-12-05 | |
Final Drill Date: 1992-12-08 | |
Well Total Depth: 837.00 m | |
Surface Hole Latitude: 52.545968 | |
Surface Hole Longitude: -110.120439 |
Date | Event |
---|---|
1992-12-01 | Obtained License |
1992-12-06 | Surface Casing Operation Performed |
1992-12-07 | Direction Drilling Operation Performed - Deviate |
1992-12-08 | Finished Drilling |
1992-12-08 | Production Casing Operation Performed |
1992-12-08 | Rig Released |
1992-12-08 | Well Log Performed |
1992-12-08 | Well Mode changed to Drilled and Cased |
1992-12-11 | Perforation Treatment Performed - Jet Perforation |
1992-12-12 | Well Began Production |
1992-12-12 | Well Fluid changed to Crude Oil |
1992-12-12 | Well Mode changed to Pumping |
1993-01-12 | Well Log Performed |
1993-03-09 | Perforation Treatment Performed - Jet Perforation |
1993-03-10 | Perforation Treatment Performed - Cement Squeeze |
1993-03-12 | Perforation Treatment Performed - Jet Perforation |
1993-03-13 | Perforation Treatment Performed - Cement Squeeze |
1993-03-15 | Perforation Treatment Performed - Jet Perforation |
1993-04-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-04-30 | Perforation Treatment Performed - Jet Perforation |
1993-05-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1993-05-01 | Perforation Treatment Performed - Cement Squeeze |
1993-05-04 | Perforation Treatment Performed - Jet Perforation |
2007-10-01 | Well Fluid changed to Crude Oil |
2007-10-01 | Well Mode changed to Suspended |
2018-09-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-09-12 | Plug Back Performed |
2018-09-12 | Well Fluid changed to Crude Oil |
2018-09-12 | Well Mode changed to Abandoned Zone |
2018-10-18 | Well Abandoned |
2018-10-18 | Well Fluid changed to Crude Oil |
2018-10-18 | Well Mode changed to Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1992-12-07 | 256.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1992-12-11 | Perforation | 796.00 | 797.20 | 13 |
1993-04-30 | Perforation | 806.50 | 806.80 | 13 |
1993-04-30 | Acid Treatment | 796.00 | 806.80 | 0 |
1993-05-01 | Acid Treatment | 796.00 | 806.80 | 0 |
1993-05-01 | Cement Squeeze | 796.00 | 806.80 | 0 |
1993-05-04 | Perforation | 796.00 | 797.20 | 13 |
1993-05-04 | Perforation | 798.00 | 800.50 | 13 |
2018-09-12 | Packing Device Capped w/Cement | 779.00 | 789.50 | 0 |
1992-12-11 | Perforation | 798.00 | 800.50 | 13 |
1993-03-09 | Perforation | 806.50 | 807.50 | 13 |
1993-03-10 | Cement Squeeze | 796.50 | 807.50 | 0 |
1993-03-12 | Perforation | 796.00 | 797.20 | 13 |
1993-03-12 | Perforation | 798.00 | 800.50 | 13 |
1993-03-13 | Cement Squeeze | 796.00 | 800.50 | 0 |
1993-03-15 | Perforation | 796.00 | 797.20 | 13 |
1993-03-15 | Perforation | 798.00 | 800.50 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1992 | 432 | 0.0 | 0.0 | 0.0 |
1993 | 8262 | 0.0 | 0.0 | 0.0 |
1994 | 8692 | 0.0 | 0.0 | 0.0 |
1995 | 8701 | 0.0 | 0.0 | 0.0 |
1996 | 8701 | 0.0 | 0.0 | 0.0 |
1997 | 8539 | 0.0 | 0.0 | 0.0 |
1998 | 8699 | 0.0 | 0.0 | 0.0 |
1999 | 8725 | 0.0 | 0.0 | 0.0 |
2000 | 5979 | 0.0 | 0.0 | 0.0 |
2001 | 6133 | 0.0 | 0.0 | 0.0 |
2002 | 2702 | 0.0 | 0.0 | 0.0 |
2005 | 4049 | 0.0 | 0.0 | 0.0 |
2006 | 72 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-09-19 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]