X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414011005A02

Well Details

Well ID: 0414011005A02
Loading map...
Location: A0/05-10-041-01W4/2
Location Alias: A0/05-10-41-01 W4M
Location Alias 2: A0/05-10-041-01 W4/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 01
Section: 10
County/Municipality: Municipal District of Provost No. 52
Well Name: AMAX HAYTER 5A-10-41-1
Operator Name: Devon Aog Corporation
License Number: 0140232
License Date: 1989-06-23
License Status: RecCertified
Spud Date: 1989-06-24
Final Drill Date: 1989-06-26
Well Total Depth: 881.50 m
Surface Hole Latitude: 52.511665
Surface Hole Longitude: -110.071677

For data sources see[1][2]

Well History

Date Event
1989-06-23 Obtained License
1989-06-25 Surface Casing Operation Performed
1989-06-26 Finished Drilling
1989-06-27 Production Casing Operation Performed
1989-06-27 Well Log Performed
1989-06-28 Rig Released
1989-07-04 Well Log Performed
1989-07-05 Perforation Treatment Performed - Jet Perforation
1989-07-05 Well Log Performed
1989-07-06 Perforation Treatment Performed - Open-Hole Completion
1989-07-07 Perforation Treatment Performed - Cement Squeeze
1989-07-07 Well Log Performed
1989-07-08 Perforation Treatment Performed - Jet Perforation
1989-07-19 Perforation Treatment Performed - Jet Perforation
1989-07-19 Well Log Performed
1989-11-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-11-16 Plug Back Performed
1989-11-17 Perforation Treatment Performed - Abrasa-Jet Perforation
1989-11-17 Well Log Performed
1989-11-20 Well Mode changed to Drilled and Cased
1992-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-10-17 Plug Back Performed
1992-10-17 Well Abandoned
1992-10-17 Well Log Performed
1992-10-17 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-07-05 Perforation 864.00 865.30 13
1989-07-06 Open Hole/Barefoot Completion 878.00 881.50 0
1989-07-07 Cement Squeeze 864.00 865.30 0
1989-07-08 Perforation 864.00 865.30 13
1989-07-19 Perforation 866.00 867.50 13
1989-11-16 Packing Device Capped w/Cement 852.00 860.00 0
1989-11-17 Hydra Jet Perforation 812.00 813.00 0
1992-10-17 Packing Device Capped w/Cement 787.00 795.00 0

For data sources see[4]



References