X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0405072403000

Well Details

Well ID: 0405072403000
Loading map...
Location: 00/03-24-040-07W5/0
Location Alias: 00/03-24-40-07 W5M
Location Alias 2: 00/03-24-040-07 W5/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 5
Range: 07
Section: 24
County/Municipality: Clearwater County
Well Name: BEC HZ WILLGR 3-24-40-7
Operator Name: Bonavista Energy Corporation
License Number: 0495122
License Date: 2019-07-16
License Status: Issued
Spud Date: 2020-01-04
Final Drill Date: 2020-01-23
Well Total Depth: 7050.00 m
Surface Hole Latitude: 52.494814
Surface Hole Longitude: -114.884156

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-01-04 Savanna Drilling Corp. 656 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-01-08 1808.50 Deviate (5 - 79 degrees)
2020-01-12 2604.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-01-29 Open Hole/Barefoot Completion 7044.00 7050.00 0
2020-03-07 Multi-Stage Fracture 5901.10 5901.20 0
2020-03-07 Multi-Stage Fracture 5766.20 5766.30 0
2020-03-07 Multi-Stage Fracture 5644.10 5644.20 0
2020-03-08 Multi-Stage Fracture 5521.90 5522.00 0
2020-03-08 Multi-Stage Fracture 5412.90 5413.00 0
2020-03-08 Multi-Stage Fracture 5292.00 5292.10 0
2020-03-08 Multi-Stage Fracture 5185.00 5185.10 0
2020-03-08 Multi-Stage Fracture 5064.60 5064.70 0
2020-03-09 Multi-Stage Fracture 4944.80 4944.90 0
2020-03-09 Multi-Stage Fracture 4839.40 4839.50 0
2020-03-06 Multi-Stage Fracture 7007.60 7007.70 0
2020-03-09 Multi-Stage Fracture 4719.00 4719.10 0
2020-03-09 Multi-Stage Fracture 4603.50 4603.60 0
2020-03-09 Multi-Stage Fracture 4485.10 4485.20 0
2020-03-09 Multi-Stage Fracture 4372.60 4372.70 0
2020-03-09 Multi-Stage Fracture 4259.80 4259.90 0
2020-03-09 Multi-Stage Fracture 4146.40 4146.50 0
2020-03-09 Multi-Stage Fracture 4027.40 4027.50 0
2020-03-09 Multi-Stage Fracture 3909.80 3909.90 0
2020-03-09 Multi-Stage Fracture 3791.10 3791.20 0
2020-03-09 Multi-Stage Fracture 3683.10 3683.20 0
2020-03-06 Multi-Stage Fracture 6776.40 6776.50 0
2020-03-09 Multi-Stage Fracture 3566.20 3566.30 0
2020-03-09 Multi-Stage Fracture 3444.80 3444.90 0
2020-03-09 Multi-Stage Fracture 3337.70 3337.80 0
2020-03-09 Multi-Stage Fracture 3214.90 3215.00 0
2020-03-09 Multi-Stage Fracture 3107.00 3107.10 0
2020-03-09 Multi-Stage Fracture 2985.00 2985.10 0
2020-03-09 Multi-Stage Fracture 2876.80 2876.90 0
2020-03-09 Multi-Stage Fracture 2753.40 2753.50 0
2020-03-09 Multi-Stage Fracture 2644.50 2644.60 0
2020-03-06 Multi-Stage Fracture 6640.90 6641.00 0
2020-03-06 Multi-Stage Fracture 6519.30 6519.40 0
2020-03-06 Multi-Stage Fracture 6397.90 6398.00 0
2020-03-06 Multi-Stage Fracture 6265.30 6265.40 0
2020-03-06 Multi-Stage Fracture 6144.70 6144.80 0
2020-03-07 Multi-Stage Fracture 6023.40 6023.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 96 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-16 No Incident Encountered 0.00 0.00
2020-03-17 No Incident Encountered 0.00 0.00

For data sources see[7]

References