If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0405062413000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.449913,"lon":-114.737898,"icon":""}]} |
| Location: 00/13-24-040-06W5/0 | |
| Location Alias: 00/13-24-40-06 W5M | |
| Location Alias 2: 00/13-24-040-06 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 040 | |
| Meridian: 5 | |
| Range: 06 | |
| Section: 24 | |
| County/Municipality: Clearwater County | |
| Well Name: ANDERSON HZ WILLGR 13-24-40-6 | |
| Operator Name: InPlay Oil Corp. | |
| License Number: 0435362 | |
| License Date: 2011-07-21 | |
| License Status: Issued | |
| Spud Date: 2011-08-07 | |
| Final Drill Date: 2011-08-19 | |
| Well Total Depth: 3573.00 m | |
| Surface Hole Latitude: 52.449913 | |
| Surface Hole Longitude: -114.737898 |
| Date | Event |
|---|---|
| 2011-07-21 | Obtained License |
| 2011-08-01 | Well Log Performed |
| 2011-08-10 | Surface Casing Operation Performed |
| 2011-08-10 | Well Log Performed |
| 2011-08-12 | Direction Drilling Operation Performed - Horizontal |
| 2011-08-19 | Finished Drilling |
| 2011-08-19 | Well Log Performed |
| 2011-08-19 | Well Mode changed to Drilled and Cased |
| 2011-08-20 | Production Casing Operation Performed |
| 2011-08-21 | Rig Released |
| 2011-08-24 | Well Log Performed |
| 2011-08-28 | Perforation Treatment Performed - Jet Perforation |
| 2011-08-28 | Well Log Performed |
| 2011-08-29 | Perforation Treatment Performed - Jet Perforation |
| 2011-08-29 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-09-01 | Well Began Production |
| 2011-09-01 | Well Fluid changed to Crude Oil |
| 2011-09-01 | Well Mode changed to Flowing |
| 2011-09-02 | Well Log Performed |
| 2011-09-11 | Well Fluid changed to Crude Oil |
| 2011-09-11 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-08-12 | 1420.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-08-28 | Perforation | 3397.00 | 3397.50 | 3 |
| 2011-08-29 | Multi-Stage Fracture | 3295.00 | 3295.50 | 0 |
| 2011-08-29 | Multi-Stage Fracture | 3150.00 | 3150.50 | 0 |
| 2011-08-29 | Multi-Stage Fracture | 3113.00 | 3113.50 | 0 |
| 2011-08-29 | Multi-Stage Fracture | 3065.00 | 3065.50 | 0 |
| 2011-08-29 | Multi-Stage Fracture | 2973.00 | 2973.50 | 0 |
| 2011-08-29 | Perforation | 2730.00 | 2730.50 | 3 |
| 2011-08-29 | Perforation | 2670.00 | 2670.50 | 3 |
| 2011-08-29 | Perforation | 2610.00 | 2610.50 | 3 |
| 2011-08-29 | Perforation | 2553.00 | 2553.50 | 3 |
| 2011-08-29 | Perforation | 2500.00 | 2500.50 | 3 |
| 2011-08-28 | Perforation | 3352.00 | 3352.50 | 3 |
| 2011-08-29 | Perforation | 2435.00 | 2435.50 | 3 |
| 2011-08-29 | Perforation | 2350.00 | 2350.50 | 3 |
| 2011-08-29 | Multi-Stage Fracture | 2730.00 | 2730.50 | 0 |
| 2011-08-29 | Multi-Stage Fracture | 2670.00 | 2670.50 | 0 |
| 2011-08-29 | Multi-Stage Fracture | 2610.00 | 2610.50 | 0 |
| 2011-08-29 | Multi-Stage Fracture | 2553.00 | 2553.50 | 0 |
| 2011-08-29 | Multi-Stage Fracture | 2500.00 | 2500.50 | 0 |
| 2011-08-29 | Multi-Stage Fracture | 2435.00 | 2435.50 | 0 |
| 2011-08-29 | Multi-Stage Fracture | 2350.00 | 2350.50 | 0 |
| 2011-08-28 | Perforation | 3295.00 | 3295.50 | 3 |
| 2011-08-28 | Perforation | 3150.00 | 3150.50 | 3 |
| 2011-08-28 | Perforation | 3113.00 | 3113.50 | 3 |
| 2011-08-28 | Perforation | 3065.00 | 3065.50 | 3 |
| 2011-08-28 | Perforation | 2973.00 | 2973.50 | 3 |
| 2011-08-29 | Multi-Stage Fracture | 3397.00 | 3397.50 | 0 |
| 2011-08-29 | Multi-Stage Fracture | 3352.00 | 3352.50 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 2827 | 0.0 | 0.0 | 0.0 |
| 2012 | 7417 | 0.0 | 0.0 | 0.0 |
| 2013 | 2734 | 0.0 | 0.0 | 0.0 |
| 2014 | 2082 | 0.0 | 0.0 | 0.0 |
| 2015 | 6138 | 0.0 | 0.0 | 0.0 |
| 2016 | 8657 | 0.0 | 0.0 | 0.0 |
| 2017 | 8649 | 0.0 | 0.0 | 0.0 |
| 2018 | 8737 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2160 | 0.0 | 0.0 | 0.0 |
For data sources see[6]